Installation of the Flight Control Pressure Switch
TASK 27-92-17-400-003-A
Installation of the Flight Control Pressure Switch
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 27-92-17-860-057-A
Subtask 27-92-17-420-054-B
Subtask 27-92-17-864-055-A Subtask 27-92-17-410-052-A
[Rev.10 from 2021]
2026.04.01 08:02:44 UTC
Installation of the Flight Control Pressure Switch
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
FIN: 10CE1
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| No specific | lockwire, corrosion-resistant steel, 0.8 mm (0.032 in.) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 195BB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 3 | PACKING | AIPC 27-92-03-01-020 |
| 3 | PACKING | AIPC 27-92-83-01-040 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 27-96-00-710-011-A | Operational Test after Removal/Installation of the Pressure Switches |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-863-003-A | Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-863-003-A-01 | Pressurize the Blue Hydraulic System with the Blue Electric Pump |
| TASK 29-10-00-864-003-A | Depressurize the Blue Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
Subtask 27-92-17-860-057-A
A. Aircraft Maintenance Configuration
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Make sure that the access panel 195BB is open.
(3) Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-10-00-864-003).
(4) Make sure that the reservoir of the Blue hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Blue hydraulic system:
Subtask 27-92-17-865-058-A (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Make sure that the access panel 195BB is open.
(3) Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-10-00-864-003).
(4) Make sure that the reservoir of the Blue hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Blue hydraulic system:
- In the cockpit on the hydraulic section 40VU of the overhead panel.
- On the ground service panel of the Blue hydraulic system.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
Subtask 27-92-17-420-054-B
A. Installation of the Flight Control Pressure Switch 10CE1
(1) Lubricate the new AIPC 27-92-03-01-020 PACKING (3) or AIPC 27-92-83-01-040 PACKING (3) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(2) Remove the PLUG - BLANKING from the ports of the manifold.
(3) Put the new packing (3) in position on the flight control pressure switch (2).
(4) Install the flight control pressure switch (2) in the manifold (4) and TORQUE it to between 3.470 and 3.186 m.daN (25.59 and 23.50 lbf.ft )
.
(5) Safety the flight control pressure switch (2) with lockwire, corrosion-resistant steel, 0.8 mm (0.032 in.).
(6) Install the clamp (9), the bonding strap (7), the screw (8), the washer (6) and the nut (5) at the flight control pressure switch (2) (Ref. AMM TASK 20-28-00-912-802).
(7) Remove the blanking cap from the electrical connector (1).
(8) Connect the electrical connector (1).
Subtask 27-92-17-865-055-A (1) Lubricate the new AIPC 27-92-03-01-020 PACKING (3) or AIPC 27-92-83-01-040 PACKING (3) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(2) Remove the PLUG - BLANKING from the ports of the manifold.
(3) Put the new packing (3) in position on the flight control pressure switch (2).
(4) Install the flight control pressure switch (2) in the manifold (4) and TORQUE it to between 3.470 and 3.186 m.daN (25.59 and 23.50 lbf.ft )
. (5) Safety the flight control pressure switch (2) with lockwire, corrosion-resistant steel, 0.8 mm (0.032 in.).
(6) Install the clamp (9), the bonding strap (7), the screw (8), the washer (6) and the nut (5) at the flight control pressure switch (2) (Ref. AMM TASK 20-28-00-912-802).
(7) Remove the blanking cap from the electrical connector (1).
(8) Connect the electrical connector (1).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 27-92-17-710-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
C. Test
(1) Pressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(2) Pressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-863-003).
(3) Do a test of the flight control pressure switch 10CE1 (Ref. AMM TASK 27-96-00-710-011).
(4) Examine the connection of the flight control pressure switch and make sure that there are no leaks.
5. Close-up(1) Pressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(2) Pressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-863-003).
(3) Do a test of the flight control pressure switch 10CE1 (Ref. AMM TASK 27-96-00-710-011).
(4) Examine the connection of the flight control pressure switch and make sure that there are no leaks.
Subtask 27-92-17-864-055-A Subtask 27-92-17-410-052-A
B. Close Access
(1) Remove the container.
(2) Remove the WARNING NOTICE(S).
(3) Close the access panel 195BB.
(1) Remove the container.
(2) Remove the WARNING NOTICE(S).
(3) Close the access panel 195BB.
Flight Control Pressure Switch of the Blue Hydraulic System