Installation of the Centering Rod of the Rudder Control
TASK 27-21-48-400-001-A
Installation of the Centering Rod of the Rudder Control
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 27-21-48-860-052-B
Subtask 27-21-48-640-050-A
Subtask 27-21-48-410-050-B
[Rev.10 from 2021]
2026.03.31 23:48:37 UTC
Installation of the Centering Rod of the Rudder Control
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY HYDRAULIC POWER TO THE AIRCRAFT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 325
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 0.77 and 0.63 m.daN (68.14 and 55.75 lbf.in ) ![]() | |
| 98D27207545000 | 1 | PIN-RIGGING |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03GBD1) | Synthetic Oil base Grease-General Purpose Lithium Thickened - |
| (Material No.03HBD9) | Synthetic Ester base Grease-General Purpose Low Temp - |
| (Material No.05ABF1) | Retaining adhesive-Cylindrical fitting Medium strength Low viscosity - |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| No specific | lockwire corrosion-resistant steel 0.8 mm (0.032 in.) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 325 | VERTICAL STABILIZER TRAILING EDGE |
| 325DL, 325DR |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 11 | COTTER PIN | AIPC 27-21-04-11-050 |
| 4 | COTTER PIN | AIPC 27-21-04-11-050 |
| 11 | COTTER PIN | AIPC 27-21-84-13-010 |
| 4 | COTTER PIN | AIPC 27-21-84-13-010 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 27-21-00-720-002-A | Functional Test of the Rudder Mechanical Control |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 55-33-13-010-002-A | Opening/Removal of the Trailing Edge Access-Panels of the Vertical Stabilizer |
| TASK 55-33-13-410-002-A | Closing/Installation of the Trailing Edge Access-Panels of the Vertical Stabilizer |
Subtask 27-21-48-860-052-B
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE is in position at zone 325.
(2) Make sure that the access panel 325DL is open and the access panel 325DR is removed (Ref. AMM TASK 55-33-13-010-002).
(3) Make sure that the rudder pedals are in the neutral position.
(4) Make sure that the RUD TRIM indicator on the center pedestal, on the panel 110VU shows 0.
(5) Make sure that the WARNING NOTICE(S) are in position in the cockpit to tell persons not to operate the flight controls.
(6) Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration
(Ref. AMM TASK 29-00-00-864-001).
(7) Make sure that the aircraft electrical circuits are de-energized (Ref. AMM TASK 24-41-00-862-002).
(8) Make sure that the warning notices are in position to tell persons not to pressurize the Green, the Yellow and the Blue hydraulic systems:
Subtask 27-21-48-865-051-A (1) Make sure that the ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE is in position at zone 325.
(2) Make sure that the access panel 325DL is open and the access panel 325DR is removed (Ref. AMM TASK 55-33-13-010-002).
(3) Make sure that the rudder pedals are in the neutral position.
(4) Make sure that the RUD TRIM indicator on the center pedestal, on the panel 110VU shows 0.
(5) Make sure that the WARNING NOTICE(S) are in position in the cockpit to tell persons not to operate the flight controls.
(6) Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration
(Ref. AMM TASK 29-00-00-864-001).
(7) Make sure that the aircraft electrical circuits are de-energized (Ref. AMM TASK 24-41-00-862-002).
(8) Make sure that the warning notices are in position to tell persons not to pressurize the Green, the Yellow and the Blue hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue hydraulic systems.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 27-21-48-210-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/FAC1/28VDC | 5CC1 | B04 |
| 49VU | AUTO FLT/FAC1/26VAC | 14CC1 | B03 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/FAC1/28VDC | 5CC1 | H10 |
| 49VU | AUTO FLT/FAC1/26VAC | 14CC1 | H09 |
| ** ON A/C ALL | |||
| 121VU | AUTO FLT/RUDDER/TRIM/IND | 15CC | M20 |
| 121VU | AUTO FLT/FAC2/28VDC | 5CC2 | M19 |
| 121VU | AUTO FLT/FAC2/26VAC | 14CC2 | M18 |
C. Examination of the Work Area, the Attachment Components and the Replacement Centering Rod
(1) Examine the work area.
(a) Make sure that:
(b) Make sure that the control rods are correctly installed at the bellcrank assembly (2) and the travel limitation unit (3).
(c) Make sure that the bellcrank assembly (2) and the travel limitation unit (3) are correctly installed on the support bracket.
(2) Examine the attachment components.
(a) Cut and remove the lockwire which temporarily safeties the sliding bushes (7),(14) in the flanged bushes (8),(15).
(b) Remove the sliding bushes (7),(14).
(c) Make sure that:
(d) Make sure that the bushes (15),(16) are tight in the lever arm of the bellcrank assembly (2).
(a) Make sure that:
4. Procedure(1) Examine the work area.
(a) Make sure that:
- the structure,
- the paintwork,
- the bellcrank assembly (2),
- the travel limitation unit (3)
(b) Make sure that the control rods are correctly installed at the bellcrank assembly (2) and the travel limitation unit (3).
(c) Make sure that the bellcrank assembly (2) and the travel limitation unit (3) are correctly installed on the support bracket.
(2) Examine the attachment components.
(a) Cut and remove the lockwire which temporarily safeties the sliding bushes (7),(14) in the flanged bushes (8),(15).
(b) Remove the sliding bushes (7),(14).
(c) Make sure that:
- the nuts (5),(12),
- the bushes (7),(8),(9),(14),(15),(16),
- the bolts (10),(17)
(d) Make sure that the bushes (15),(16) are tight in the lever arm of the bellcrank assembly (2).
NOTE: Safety the bushes (15),(16) in the lever arm of the bellcrank assembly (2) if necessary, with Retaining adhesive-Cylindrical fitting Medium strength Low viscosity - (Material No.05ABF1) .
(3) Examine the replacement centering rod (1). (a) Make sure that:
- the centering rod (1) is serviceable,
- the bushes (8),(9) are correctly installed in the fork-end,
- the bushes (8),(9) and the eye-end bearing are clean and show no damage,
- the drain and vent holes are clean,
- the lock-nut (19) is not safetied to the safety washer (18).
Subtask 27-21-48-640-050-A
A. Preparation for Installation
(1) Apply Synthetic Oil base Grease-General Purpose Lithium Thickened - (Material No.03GBD1) or Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to the threads of the bolts (10),(17).
(2) Apply Synthetic Oil base Grease-General Purpose Lithium Thickened - (Material No.03GBD1) or Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to the sliding bushes (7),(14).
(3) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the shafts of the bolts (10),(17).
Subtask 27-21-48-420-050-A (1) Apply Synthetic Oil base Grease-General Purpose Lithium Thickened - (Material No.03GBD1) or Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to the threads of the bolts (10),(17).
(2) Apply Synthetic Oil base Grease-General Purpose Lithium Thickened - (Material No.03GBD1) or Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to the sliding bushes (7),(14).
(3) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the shafts of the bolts (10),(17).
B. Installation of the Centering Rod
(1) Put the sliding bush (7) in the flanged bush (8) at the fork-end of the centering rod (1).
(2) Put the fork-end of the centering rod (1) in position on the attachment bracket.
(3) Install the bolt (10).
(4) Put the sliding bush (14) in the flanged bush (15) at the lever arm of the bellcrank assembly (2).
(5) Put the eye-end of the centering rod (1) in position in the lever arm of the bellcrank assembly (2).
(6) Align the hole in the eye-end bearing with the hole in the lever arm of the bellcrank assembly (2).
(a) Cut and remove the lockwire from the lock-nut (19) and the safety washer (18).
(b) Release the lock-nut (19).
(c) Turn the eye-end and adjust the length of the centering rod (1) as necessary.
(e) Make sure that you can install the bolt (17) smoothly.
(f) Do the steps (c),(d) and (e) again if necessary.
(g) Tighten the lock-nut (19).
(h) Install the bolt (17).
(i) Safety the lock-nut (19) to the safety washer (18) with lockwire corrosion-resistant steel 0.8 mm (0.032 in.).
(7) Connect the centering rod (1) to the attachment bracket.
(a) Install the washer (6) and the nut (5) on the bolt (10).
(b) TORQUE the nut (5) to between 0.77 and 0.63 m.daN (68.14 and 55.75 lbf.in )
and then loosen it, if necessary, to the next cotter pin hole.
(c) Safety the nut (5) with a new AIPC 27-21-04-11-050 COTTER PIN (4) or AIPC 27-21-84-13-010 COTTER PIN (4).
(8) Connect the centering rod (1) to the bellcrank assembly (2).
(a) Install the washer (13) and the nut (12) on the bolt (17).
(b) TORQUE the nut (12) to between 0.77 and 0.63 m.daN (68.14 and 55.75 lbf.in )
and then loosen it, if necessary, to the next cotter pin hole.
(c) Safety the nut (12) with a new AIPC 27-21-04-11-050 COTTER PIN (11) or AIPC 27-21-84-13-010 COTTER PIN (11).
Subtask 27-21-48-860-051-A (1) Put the sliding bush (7) in the flanged bush (8) at the fork-end of the centering rod (1).
(2) Put the fork-end of the centering rod (1) in position on the attachment bracket.
(3) Install the bolt (10).
(4) Put the sliding bush (14) in the flanged bush (15) at the lever arm of the bellcrank assembly (2).
(5) Put the eye-end of the centering rod (1) in position in the lever arm of the bellcrank assembly (2).
(6) Align the hole in the eye-end bearing with the hole in the lever arm of the bellcrank assembly (2).
(a) Cut and remove the lockwire from the lock-nut (19) and the safety washer (18).
(b) Release the lock-nut (19).
(c) Turn the eye-end and adjust the length of the centering rod (1) as necessary.
NOTE: Make sure that the centering rod (1) is in safety (the threads can be seen at the inspection hole).
(d) Put the eye-end of the centering rod (1) in position in the lever arm. (e) Make sure that you can install the bolt (17) smoothly.
(f) Do the steps (c),(d) and (e) again if necessary.
(g) Tighten the lock-nut (19).
(h) Install the bolt (17).
(i) Safety the lock-nut (19) to the safety washer (18) with lockwire corrosion-resistant steel 0.8 mm (0.032 in.).
(7) Connect the centering rod (1) to the attachment bracket.
(a) Install the washer (6) and the nut (5) on the bolt (10).
(b) TORQUE the nut (5) to between 0.77 and 0.63 m.daN (68.14 and 55.75 lbf.in )
and then loosen it, if necessary, to the next cotter pin hole. (c) Safety the nut (5) with a new AIPC 27-21-04-11-050 COTTER PIN (4) or AIPC 27-21-84-13-010 COTTER PIN (4).
(8) Connect the centering rod (1) to the bellcrank assembly (2).
(a) Install the washer (13) and the nut (12) on the bolt (17).
(b) TORQUE the nut (12) to between 0.77 and 0.63 m.daN (68.14 and 55.75 lbf.in )
and then loosen it, if necessary, to the next cotter pin hole. (c) Safety the nut (12) with a new AIPC 27-21-04-11-050 COTTER PIN (11) or AIPC 27-21-84-13-010 COTTER PIN (11).
C. Preparation for Test
(1) Remove the 98D27207545000 PIN-RIGGING (20) from the bellcrank assembly.
(2) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch. The OFF legend goes off.
(3) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch. The OFF legend goes off.
Subtask 27-21-48-865-052-A (1) Remove the 98D27207545000 PIN-RIGGING (20) from the bellcrank assembly.
(2) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch. The OFF legend goes off.
(3) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch. The OFF legend goes off.
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 27-21-48-710-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/FAC1/28VDC | 5CC1 | B04 |
| 49VU | AUTO FLT/FAC1/26VAC | 14CC1 | B03 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/FAC1/28VDC | 5CC1 | H10 |
| 49VU | AUTO FLT/FAC1/26VAC | 14CC1 | H09 |
| ** ON A/C ALL | |||
| 121VU | AUTO FLT/RUDDER/TRIM/IND | 15CC | M20 |
| 121VU | AUTO FLT/FAC2/28VDC | 5CC2 | M19 |
| 121VU | AUTO FLT/FAC2/26VAC | 14CC2 | M18 |
E. Test
(1) Do the functional test of the rudder mechanical control (Ref. AMM TASK 27-21-00-720-002).
5. Close-up(1) Do the functional test of the rudder mechanical control (Ref. AMM TASK 27-21-00-720-002).
Subtask 27-21-48-410-050-B
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access panel 325DL and install the access panel 325DR (Ref. AMM TASK 55-33-13-410-002).
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access panel 325DL and install the access panel 325DR (Ref. AMM TASK 55-33-13-410-002).
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
Centering Rod - Rudder Control