Reactivation of the Enclosure
TASK 25-62-00-440-005-A
Reactivation of the Enclosure
1. Reason for the Job
MMEL 25-62-02B
CABIN OVERWING EXIT SLIDE
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 25-62-00-010-073-A ** ON A/C NOT FOR ALL
Subtask 25-62-00-440-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:40:02 UTC
Reactivation of the Enclosure
1. Reason for the Job
MMEL 25-62-02B
CABIN OVERWING EXIT SLIDE
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-62-42-000-001-A | Removal of the Offwing Escape Slide |
| TASK 25-62-42-400-001-A | Installation of the Offwing Escape Slide |
| TASK 25-62-46-000-001-A | Removal of the Inflation Reservoir for the Offwing Escape Slide |
| TASK 25-62-46-400-001-A | Installation of the Inflation Reservoir for the Offwing Escape Slide |
Subtask 25-62-00-010-073-A ** ON A/C NOT FOR ALL
A. Get Access
(1) There is no special job set-up for this task.
4. Procedure(1) There is no special job set-up for this task.
Subtask 25-62-00-440-052-A ** ON A/C NOT FOR ALL
A. Reactivation Procedure
(1) Replace the related inflation reservoir, if it is discharged (Ref. AMM TASK 25-62-46-000-001) (Ref. AMM TASK 25-62-46-400-001).
(2) Replace the related escape-slide enclosure (Ref. AMM TASK 25-62-42-000-001) (Ref. AMM TASK 25-62-42-400-001).
(3) Make an entry in the logbook to record the reactivation.
(1) Replace the related inflation reservoir, if it is discharged (Ref. AMM TASK 25-62-46-000-001) (Ref. AMM TASK 25-62-46-400-001).
(2) Replace the related escape-slide enclosure (Ref. AMM TASK 25-62-42-000-001) (Ref. AMM TASK 25-62-42-400-001).
(3) Make an entry in the logbook to record the reactivation.