Installation of the In-Seat Power Supply Unit (ISPSU)
TASK 25-21-38-400-001-A
Installation of the In-Seat Power Supply Unit (ISPSU)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-21-38-860-050-A ** ON A/C NOT FOR ALL Subtask 25-21-38-865-056-A ** ON A/C NOT FOR ALL
Subtask 25-21-38-210-050-A ** ON A/C NOT FOR ALL
Subtask 25-21-38-862-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:30:29 UTC
Installation of the In-Seat Power Supply Unit (ISPSU)
ZONE: 200
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - PROTECTION |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-21-00-710-002-A | Operational Test of the In-Seat Power-Supply System (PED Power Supply) |
Subtask 25-21-38-860-050-A ** ON A/C NOT FOR ALL Subtask 25-21-38-865-056-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | IFE/SEAT-POWER-PAX SYS | 20MK | D08 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | INSEAT POWER-MCU 2 | 59HP | B08 |
| 2000VU | INSEAT POWER-MCU 1 | 58HP | B05 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | SEAT POWER-MCU 2 | 59HP | B08 |
| 2000VU | SEAT POWER-MCU 1 | 58HP | B05 |
Subtask 25-21-38-210-050-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
Subtask 25-21-38-420-050-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
B. Installation of the In-Seat Power Supply Unit (ISPSU)
(1) Put the ISPSU (5) in position and lock the fasteners (6).
(2) Connect the electrical connectors:
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connectors (4) and (7) to the ISPSU (5).
(e) Lock the electrical connectors (4) with the latches (3).
(f) Make sure that all connectors that are not used have a CAP - PROTECTION.
(3) Put the cover (2) in position and lock the fasteners (1).
Subtask 25-21-38-420-050-Q ** ON A/C NOT FOR ALL (1) Put the ISPSU (5) in position and lock the fasteners (6).
(2) Connect the electrical connectors:
CAUTION:
MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S).
CAUTION:
MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE UNIT.
(a) Install the bonding straps (10) with the washers (9) and the nuts (8) (Ref. AMM TASK 20-28-00-912-802). (b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connectors (4) and (7) to the ISPSU (5).
(e) Lock the electrical connectors (4) with the latches (3).
(f) Make sure that all connectors that are not used have a CAP - PROTECTION.
(3) Put the cover (2) in position and lock the fasteners (1).
B. Installation of the In-Seat Power Supply Unit (ISPSU)
(1) Put the ISPSU (11) in position and lock the fasteners (8).
(2) Connect the electrical connectors:
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connectors (9) and (12) to the ISPSU (11).
(e) Lock the electrical connectors (9) with the spring latches (10).
(3) Put the seat pan (2) in position.
(4) Install the spacers (5), the washers (6), the screws (7), the washers (4) and the nuts (3).
(5) Install the seat cushions (1).
(6) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-21-38-420-050-RZ ** ON A/C NOT FOR ALL (1) Put the ISPSU (11) in position and lock the fasteners (8).
(2) Connect the electrical connectors:
CAUTION:
MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S).
CAUTION:
MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE UNIT.
(a) Install the bonding straps (15) with the washers (14) and the nuts (13) (Ref. AMM TASK 20-28-00-912-802). (b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connectors (9) and (12) to the ISPSU (11).
(e) Lock the electrical connectors (9) with the spring latches (10).
(3) Put the seat pan (2) in position.
(4) Install the spacers (5), the washers (6), the screws (7), the washers (4) and the nuts (3).
(5) Install the seat cushions (1).
(6) Make sure that the work area is clean and clear of tools and other items.
B. Installation of the ISPSU
(1) Hold the ISPSU (10) in position and engage the fasteners (7).
(2) Connect the electrical connectors:
(a) Connect the bonding strap (12) and install the washer (13) and the nut (14) (Ref. AMM TASK 20-28-00-912-802).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(f) Make sure that all not used connectors have a CAP - PROTECTION.
(3) Put the cover (6) in position and engage the fasteners (5) on the tourist class seat.
(4) For the Business Class (B/C) seat:
(a) Put the cover (4) in position and engage the fasteners (5).
(b) Put the cover (3) in position and install the washer (2) and the screw (1).
(c) Tighten the screw (1).
(5) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-21-38-865-052-A ** ON A/C NOT FOR ALL (1) Hold the ISPSU (10) in position and engage the fasteners (7).
(2) Connect the electrical connectors:
(a) Connect the bonding strap (12) and install the washer (13) and the nut (14) (Ref. AMM TASK 20-28-00-912-802).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
CAUTION:
MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S).
(d) Connect the electrical connectors (8) and (11) to the ISPSU (10). CAUTION:
MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE UNIT.
(e) Engage the spring latches (9). (f) Make sure that all not used connectors have a CAP - PROTECTION.
(3) Put the cover (6) in position and engage the fasteners (5) on the tourist class seat.
(4) For the Business Class (B/C) seat:
(a) Put the cover (4) in position and engage the fasteners (5).
(b) Put the cover (3) in position and install the washer (2) and the screw (1).
(c) Tighten the screw (1).
(5) Make sure that the work area is clean and clear of tools and other items.
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 25-21-38-710-050-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | IFE/SEAT-POWER-PAX SYS | 20MK | D08 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | INSEAT POWER-MCU 2 | 59HP | B08 |
| 2000VU | INSEAT POWER-MCU 1 | 58HP | B05 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | SEAT POWER-MCU 2 | 59HP | B08 |
| 2000VU | SEAT POWER-MCU 1 | 58HP | B05 |
Subtask 25-21-38-862-050-A ** ON A/C NOT FOR ALL
In-Seat Power-Supply Unit