Installation of the High Frequency (HF) Antenna
TASK 23-11-11-400-001-A
Installation of the High Frequency (HF) Antenna
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 23-11-11-860-050-A ** ON A/C NOT FOR ALL
Subtask 23-11-11-910-051-C ** ON A/C NOT FOR ALL
Subtask 23-11-11-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 04:04:17 UTC
Installation of the High Frequency (HF) Antenna
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING:
MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND RELATED DOORS
- COMPONENTS THAT MOVE.
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE |
| No specific | 1 | ACCESS PLATFORM 8M (26 FT) - ADJUSTABLE |
| 98L12003001000 | 1 | HARNESS,SAFETY |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04QAB2) | Coating_- Flexible Structure |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.12ABE2) | Corrosion Preventive Compound-Water Displacing Oily Film System |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 321 | DORSAL FIN |
| 322 | VERTICAL STABILIZER LEADING EDGE |
| 321AL, 322AL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-720-005-A | Check of the Electrical Bonding of the Different Components (but not the Fluid Systems and Components Installed on Composite materials) |
| TASK 23-11-00-200-001-A | Check of the Electrical Bonding of the High Frequency (HF) System |
| TASK 23-11-00-710-001-A | Operational Test of the High Frequency (HF) System |
| TASK 53-45-11-000-001-A | Removal of the Dorsal Fin |
| TASK 53-45-11-400-001-A | Installation of the Dorsal Fin |
| TASK 55-32-11-000-001-A | Removal of the Vertical Stabilizer Leading-Edge |
| TASK 55-32-11-400-001-A | Installation of the Vertical Stabilizer Leading-Edge |
Subtask 23-11-11-860-050-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put on a safety harness:
(2) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in position at zone 322.
(3) Make sure that access panels 321AL and 322AL are removed (Ref. AMM TASK 53-45-11-000-001) and (Ref. AMM TASK 55-32-11-000-001).
Subtask 23-11-11-860-050-GL ** ON A/C NOT FOR ALL (1) Put on a safety harness:
WARNING:
BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
(a) Put and attach a 98L12003001000 HARNESS,SAFETY before you start work in the work area. (2) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in position at zone 322.
(3) Make sure that access panels 321AL and 322AL are removed (Ref. AMM TASK 53-45-11-000-001) and (Ref. AMM TASK 55-32-11-000-001).
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 8M (26 FT) - ADJUSTABLE is in position at Zone 322.
(2) Make sure that the access panels 321AL and 322AL are removed (Ref. AMM TASK 53-45-11-000-001) and (Ref. AMM TASK 55-32-11-000-001).
Subtask 23-11-11-865-057-A (1) Make sure that the ACCESS PLATFORM 8M (26 FT) - ADJUSTABLE is in position at Zone 322.
(2) Make sure that the access panels 321AL and 322AL are removed (Ref. AMM TASK 53-45-11-000-001) and (Ref. AMM TASK 55-32-11-000-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HF1 | 1RE1 | HA14 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/HF2 | 1RE2 | L13 |
Subtask 23-11-11-910-051-C ** ON A/C NOT FOR ALL
A. Preparation for Installation
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Apply the Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to all the screws.
Subtask 23-11-11-910-051-GL ** ON A/C NOT FOR ALL WARNING:
DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
(1) Clean the component interface and/or the adjacent area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) . - FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
NOTE: The antenna mounting screws give electrical bonding between the antenna and the fuselage structure.
(2) Do a check of the electrical bonding between antenna and the fuselage structure (Ref. AMM TASK 20-28-00-720-005). (3) Do an inspection of the component interfaces and the adjacent area.
(4) Apply the Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to all the screws.
A. Preparation for Installation
(3) Apply the Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to all the screws.
Subtask 23-11-11-420-050-A ** ON A/C NOT FOR ALL WARNING:
DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
(1) Clean the component interface and/or the adjacent area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) . - FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
NOTE: The antenna mounting screws give electrical bonding between the antenna and the fuselage structure.
(2) Do an inspection of the component interfaces and the adjacent area.(3) Apply the Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to all the screws.
B. Installation of the HF Antenna
(1) Put the antenna (1) on the antenna supports (6) and install with the screws (4) and the washers (5).
(2) Connect the feedline (2) to the antenna (1) with the cap nut (3).
(3) Apply the Coating_- Flexible Structure (Material No.04QAB2) to all the heads of the screws (4).
(4) Examine the antenna assembly for the condition of the Corrosion Preventive Compound-Water Displacing Oily Film System (Material No.12ABE2) layer. Apply a new layer if necessary.
(5) Do a check of the electrical bonding of the HF system (Ref. AMM TASK 23-11-00-200-001).
Subtask 23-11-11-420-050-B ** ON A/C NOT FOR ALL (1) Put the antenna (1) on the antenna supports (6) and install with the screws (4) and the washers (5).
(2) Connect the feedline (2) to the antenna (1) with the cap nut (3).
(3) Apply the Coating_- Flexible Structure (Material No.04QAB2) to all the heads of the screws (4).
(4) Examine the antenna assembly for the condition of the Corrosion Preventive Compound-Water Displacing Oily Film System (Material No.12ABE2) layer. Apply a new layer if necessary.
(5) Do a check of the electrical bonding of the HF system (Ref. AMM TASK 23-11-00-200-001).
B. Installation of the HF Antenna
(1) Put the antenna (1) on the antenna supports (6) and install with the screws (4) and the washers (5).
(2) Connect the feedlines (2) and (7) to the antenna (1) with the cap nuts (3).
(3) Apply the Coating_- Flexible Structure (Material No.04QAB2) to all the heads of the screws (4).
(4) Examine the antenna assembly for the condition of the Corrosion Preventive Compound-Water Displacing Oily Film System (Material No.12ABE2) layer. Apply a new layer if necessary.
(5) Do a check of the electrical bonding of the HF system (Ref. AMM TASK 23-11-00-200-001).
Subtask 23-11-11-420-050-GL ** ON A/C NOT FOR ALL (1) Put the antenna (1) on the antenna supports (6) and install with the screws (4) and the washers (5).
(2) Connect the feedlines (2) and (7) to the antenna (1) with the cap nuts (3).
(3) Apply the Coating_- Flexible Structure (Material No.04QAB2) to all the heads of the screws (4).
(4) Examine the antenna assembly for the condition of the Corrosion Preventive Compound-Water Displacing Oily Film System (Material No.12ABE2) layer. Apply a new layer if necessary.
(5) Do a check of the electrical bonding of the HF system (Ref. AMM TASK 23-11-00-200-001).
B. Installation of the HF Antenna
(1) Put the antenna (1) on the antenna supports (6) and install with the screws (4) and the washers (5).
(2) Connect the feedline (2) to the antenna (1) with the cap nut (3).
(3) Apply the Coating_- Flexible Structure (Material No.04QAB2) to all the screw heads.
(4) Examine the antenna assembly for the condition of the moisture-removing oil layer, Corrosion Preventive Compound-Water Displacing Oily Film System (Material No.12ABE2) . Apply a new layer if necessary.
Subtask 23-11-11-865-058-A (1) Put the antenna (1) on the antenna supports (6) and install with the screws (4) and the washers (5).
(2) Connect the feedline (2) to the antenna (1) with the cap nut (3).
(3) Apply the Coating_- Flexible Structure (Material No.04QAB2) to all the screw heads.
(4) Examine the antenna assembly for the condition of the moisture-removing oil layer, Corrosion Preventive Compound-Water Displacing Oily Film System (Material No.12ABE2) . Apply a new layer if necessary.
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 23-11-11-710-050-A ** ON A/C NOT FOR ALL Subtask 23-11-11-710-050-GL ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HF1 | 1RE1 | HA14 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/HF2 | 1RE2 | L13 |
Subtask 23-11-11-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install access panels 321AL and 322AL (Ref. AMM TASK 53-45-11-400-001) (Ref. AMM TASK 55-32-11-400-001).
Subtask 23-11-11-410-051-GL ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install access panels 321AL and 322AL (Ref. AMM TASK 53-45-11-400-001) (Ref. AMM TASK 55-32-11-400-001).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels 321AL and 322AL (Ref. AMM TASK 53-45-11-400-001) and (Ref. AMM TASK 55-32-11-400-001).
Subtask 23-11-11-942-050-GL ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels 321AL and 322AL (Ref. AMM TASK 53-45-11-400-001) and (Ref. AMM TASK 55-32-11-400-001).
B. Put the aircraft back to its initial configuration.
(1) Remove the access platform(s).
(1) Remove the access platform(s).
HF Antenna