W DOC AIRBUS | AMM A320F

Removal of the Air Conditioning Pack


TASK 21-52-41-000-001-A
Removal of the Air Conditioning Pack


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS.
NOTE: The procedure is the same for the air conditioning pack 10HM (11HM)
FIN: 10HM
FIN: 11HM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
1
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [10HM] (PACK 1-AIR CONDITIONING)
191BB, 191KB
FOR [11HM] (PACK 2-AIR CONDITIONING)
192FB, 192KB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-52-41-200-001-A
Attachment Components (In-Service Wear Limits) - Air Conditioning Pack
TASK 21-58-54-000-001-A
Removal of the Temperature Control Module
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
F Air Duct Connections ** ON A/C NOT FOR ALL
F Air Duct Connections ** ON A/C NOT FOR ALL
F Air Duct Connections ** ON A/C NOT FOR ALL
F Air Duct Connections ** ON A/C NOT FOR ALL
F Attached Components ** ON A/C NOT FOR ALL
F Attached Components ** ON A/C NOT FOR ALL
F Attached Components ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 21-52-41-861-051-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 21-52-41-941-050-A
B. Safety Precautions
   (1) On the overhead panel, on the control panel 30VU:
     (a) Make sure that:
  • the APU BLEED pushbutton switch is in the off position (the ON legend is off) and,
  • the ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
     (b) Put a WARNING NOTICE(S) in position to tell persons not to operate these pushbutton switches.
   (2) On the HP ground connector put a WARNING NOTICE(S) in position to tell persons not to supply the ground air.
Subtask 21-52-41-865-050-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HM (PACK 1AIR CONDITIONING)
49VUAIR COND/FLOW/CTL &/IND11HBD07
** ON A/C NOT FOR ALL
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAN28
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAP28
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
** ON A/C NOT FOR ALL
122VUCSAS / CTRL1HWU17
** ON A/C NOT FOR ALL
FOR FIN: 11HM (PACK 2AIR CONDITIONING)
122VUAIR COND/FLOW/CTL AND IND/22HBV21
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-52-41-010-050-A
D. Get Access

   (1) Remove the access panel/s (Ref. AMM TASK 53-35-13-000-002).
     (a) FOR [10HM] (PACK 1-AIR CONDITIONING)
     (b) FOR [11HM] (PACK 2-AIR CONDITIONING)
4. Procedure
Subtask 21-52-41-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Cross Beam and the Duct Connectors
F Air Duct Connections ** ON A/C NOT FOR ALL
   (1) Remove the quick release pins (13) and (14) and the cross beam (11).
   (2) Remove the clamp (9) and disconnect the sleeve (10).
   (3) Remove the clamp (6) and disconnect the bellows (7).
   (4) Remove the clamp (2) and disconnect the bellows (3).
   (5) Remove the clamp (36).
   (6) Remove the clamp (30) and move the sleeve (31) on the duct flange (43) (away from the air conditioning pack (4)).
   (7) Remove the clamp (34) and move the duct (33) and the sleeve (32) to the air conditioning pack (4).
Subtask 21-52-41-020-050-B ** ON A/C NOT FOR ALL
A. Removal of the Cross Beam and the Duct Connectors
F Air Duct Connections ** ON A/C NOT FOR ALL
   (1) Remove the quick release pins (13) and (14) and the cross beam (11).
   (2) Remove the clamp (9) and disconnect the sleeve (10).
   (3) Remove the clamp (6) and disconnect the bellows (7).
   (4) Remove the clamp (2) and disconnect the bellows (3).
   (5) Remove the clamp (30) and move the sleeve (31) on the duct flange (43) (away from the air conditioning pack (4)).
   (6) Remove the clamp (34) and move the duct (33) and the sleeve (32) to the air conditioning pack (4).
Subtask 21-52-41-020-050-C ** ON A/C NOT FOR ALL
A. Removal of the Cross Beam and the Duct Connectors
F Air Duct Connections ** ON A/C NOT FOR ALL
   (1) Remove the quick release pins (13) and (14) and the cross beam (11).
   (2) Remove the clamp (9) and disconnect the sleeve (10).
   (3) Remove the clamp (6) and disconnect the bellow (7).
   (4) Remove the clamp (2) and disconnect the bellow (3).
   (5) Remove the clamp (30) and move the sleeve (31) on the duct flange (35) (away from the air conditioning pack (4)).
   (6) Remove the clamp (34) and move the duct (33) and the sleeve (32) to the air conditioning pack (4).
   (7) For the left air-conditioning pack (10HM):
     (a) Do not remove the seals from the duct ends.
     (b) Remove the clamps (43) and the sleeves (42).
     (c) Remove the nuts (50) and the washers (49).
     (d) Hold the ducts (44) and (45) and the bonding strap (47) to remove the screws (46) and the washers (40).
     (e) Remove the ducts (44) and (45) and the bonding straps (47) and (48).
     (f) Remove and discard the seals (51).
Subtask 21-52-41-020-050-E ** ON A/C NOT FOR ALL
A. Removal of the Cross Beam and the Duct Connections
F Air Duct Connections ** ON A/C NOT FOR ALL
   (1) Remove the quick-release pins (13) and (14) and the cross beam (11).
   (2) Remove the clamp (9) and disconnect the sleeve (10).
   (3) Remove the clamps (6) and (53) and disconnect the bellow (7).
   (4) Remove the clamp (2) and disconnect the bellow of the air conditioning pack (4).
   (5) Remove the clamp (30) and move the sleeve (31) to the duct flange (35).
   (6) Remove the clamp (34) and move the duct (33) and the sleeve (32) from the air conditioning pack (4).
   (7) Do the steps that follow for the left air-conditioning pack (10HM):
     (a) Do not remove the seals from the duct ends.
     (b) Remove the clamps (43) and the sleeves (42).
     (c) Remove the seals (141) and discard them.
     (d) Remove the nuts (50) and the washers (49).
     (e) Hold the ducts (44) and (45) and the bonding strap (47), and remove the screws (46) the washers (40) and the heat shield (140).
     (f) Remove the bonding strap (47) from the ducts (44) and (45).
     (g) Disconnect the bonding strap (48) from the duct (45).
     (h) Remove the ducts (44) and (45).
     (i) Remove the seals (51) and discard them.
Subtask 21-52-41-020-051-A ** ON A/C NOT FOR ALL
B. Disconnection of the Electrical and Sense Line Connectors

   (1) Disconnect the electrical connectors (52), (53), (56), (59), (62) and (66).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Disconnect the sense lines (57) and (64).
   (4) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-52-41-020-051-C ** ON A/C NOT FOR ALL
B. Disconnection of the Electrical and Sense Line Connectors

   (1) Disconnect the electrical connectors (52), (53), (56), (59), (62), (66) and (67).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Disconnect the sense lines (57) and (64).
   (4) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-52-41-020-051-D ** ON A/C NOT FOR ALL
B. Disconnection of the Electrical and Sense Line Connectors

   (1) Disconnect the electrical connectors (52), (53), (55) and (59).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Disconnect the sense lines (57) and (61).
   (4) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-52-41-020-051-E ** ON A/C NOT FOR ALL
B. Disconnection of the Electrical and Sense Line Connectors

   (1) Disconnect the electrical connectors (52), (53), (55) and (59).
   (2) For the left air conditioning pack (10HM):
  • Disconnect the electrical connectors (63), (65) and (67).
   (3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (4) Disconnect the sense lines (57) and (61).
   (5) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-52-41-020-052-A
C. Removal of the Air Conditioning Pack

   (1) Remove the nut (86), the washer (85), the screw (84) and disconnect the bonding straps (87) (if installed) and (88).
   (2) Remove the nuts (104), the washers (103), the screws (101) and disconnect the bonding straps (102).
WARNING: SUPPORT THE UNIT/ASSEMBLY. THE UNIT/ASSEMBLY IS HEAVY. IF YOU DO NOT SUPPORT IT, IT WILL FALL. THIS CAN CAUSE INJURY TO PERSONS, AND/OR DAMAGE TO EQUIPMENT.
   (3) Remove the air conditioning pack:
NOTE: The air conditioning pack weighs approx. 79 kg (180 lb).
You must take care not to bend or twist the air conditioning pack as this can cause damage to the component.
The air conditioning pack must be put on an approbriate support stand when you remove it from the aircraft.
     (a) Hold the air conditioning pack and:
       1 Remove the nuts (99), the washers (100), the bolts (96), (where fitted the washers (97)), and the bushes (98).
       2 Disconnect the tie rods in this order:- (71), (72), (73), (74), (75), (77), (81), (78), (79), (83), (80) and (82).
       3 Remove the nut (91), the washer (92), the bolt (89), (where fitted the washer (95)), and the bush (94).
     (b) Carefully remove the air conditioning pack from the aircraft.
   (4) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-52-41-020-053-A ** ON A/C NOT FOR ALL
D. Removal of the Attached Components

F Attached Components ** ON A/C NOT FOR ALL
F Air Duct Connections ** ON A/C NOT FOR ALL
   (1) Remove the duct (33) from the sleeve (32).
   (2) Remove the sleeve (31) from the aircraft and the sleeve (32) from the heat exchanger unit (4).
   (3) For the LEFT air conditioning pack remove and discard the seals (42) from the sleeve (31).
   (4) For the RIGHT air conditioning pack remove and discard the seals (142) from the sleeve (31).
   (5) For the LEFT air conditioning pack remove and discard the seals (39) and (40), (alternative (41)), from the sleeve (32).
   (6) For the RIGHT air conditioning pack remove and discard the seals (139) and (140), (alternative (141)), from the sleeve (32).
   (7) Put the PLUG-BLANKING in each disconnected line end.
   (8) Remove the nut (126), the washer (125), the bonding strap (88) and the screw (123).
   (9) Remove the nuts (129), the washers (128), the screws (121), the seals (122) and (124) and the inlet plenum (127).
   (10) Put a protective cover on the cooling elements of the air conditioning pack (4).
   (11) If installed: Remove the nut (130), the washer (131), the bonding strap (87) and the screw (132).
   (12) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-52-41-020-053-B ** ON A/C NOT FOR ALL
D. Removal of the Attached Components

F Attached Components ** ON A/C NOT FOR ALL
F Air Duct Connections ** ON A/C NOT FOR ALL
   (1) Remove the duct (33) from the sleeve (32).
   (2) Remove the sleeve (31) from the aircraft and the sleeve (32) from the heat exchanger unit (4).
   (3) For the LEFT air conditioning pack remove and discard the seals (38) from the sleeve (31).
   (4) For the RIGHT air conditioning pack remove and discard the seals (138) from the sleeve (31).
   (5) For the LEFT air conditioning pack remove and discard the seals (35) and (36), (alternative (37)), from the sleeve (32).
   (6) For the RIGHT air conditioning pack remove and discard the seals (135) and (136), (alternative (137)), from the sleeve (32).
   (7) Put the PLUG-BLANKING in each disconnected line end.
   (8) Remove the nut (126), the washer (125), the bonding strap (88) and the screw (123).
   (9) Remove the nuts (129), the washers (128), the screws (121), the seals (122) and (124) and the inlet plenum (127).
   (10) Put a protective cover on the cooling elements of the air conditioning pack (4).
   (11) If installed: Remove the nut (130), the washer (131), the bonding strap (87) and the screw (132).
   (12) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-52-41-020-053-C ** ON A/C NOT FOR ALL
D. Removal of the Attached Components

F Attached Components ** ON A/C NOT FOR ALL
F Air Duct Connections ** ON A/C NOT FOR ALL
F Air Duct Connections ** ON A/C NOT FOR ALL
   (1) Remove the duct (33) from the sleeve (32).
   (2) Remove the sleeve (31) from the aircraft and the sleeve (32) from the heat exchanger unit (4).
   (3) For the left air conditioning pack (10HM):
  • Remove and discard the seals (39) from the sleeve (31).
   (4) For the right air conditioning pack (11HM):
  • Remove and discard the seals (139) from the sleeve (31).
   (5) For the left air conditioning pack (10HM):
  • Remove and discard the seals (36) and (37), (alternative (38)), from the sleeve (32).
   (6) For the right air conditioning pack (11HM):
  • Remove and discard the seals (136) and (137), (alternative (138)), from the sleeve (32).
   (7) Put the PLUG-BLANKING in each disconnected line end.
   (8) For the right air conditioning pack (11HM):
     (a) Remove the nut (126), the washer (125), the bonding strap (88) and the screw (123).
     (b) Remove the nuts (129), the washers (128), the screws (121), the seals (122) and (124) and the inlet plenum (127).
     (c) Put a protective cover on the cooling elements of the air conditioning pack (4).
   (9) For the left air conditioning pack (10HM):
   (10) If installed, remove the nut (130), the washer (131), the bonding strap (87) and the screw (132).
   (11) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-52-41-020-054-A
E. Removal of the Attachment Components
   (1) Remove the nuts (99), the washers (100), the bolts (96), if fitted the washers (97), the bushings (98) and the support rods (71), (72a) and (72b), (73), (74), (75), (77), (78), (79), (80), (81), (82) and (83).
NOTE: Identify the support rods for correct position in the installation procedure.
   (2) Remove the nut (2), the washer (1) the bolt (3) and disconnect the support rods (72a) and (72b).
   (3) Do the inspection of the components for in-service wear (Ref. AMM TASK 21-52-41-200-001).