Removal of the Pressure Regulating Valve - Aft Cargo-Compartment Heating
TASK 21-43-52-000-001-A
Removal of the Pressure Regulating Valve - Aft Cargo-Compartment Heating
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-43-52-861-050-A ** ON A/C NOT FOR ALL Subtask 21-43-52-865-060-A ** ON A/C NOT FOR ALL
Subtask 21-43-52-020-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 04:53:10 UTC
Removal of the Pressure Regulating Valve - Aft Cargo-Compartment Heating
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
FIN: 11HC ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 197BB | |
| 197KB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
Subtask 21-43-52-861-050-A ** ON A/C NOT FOR ALL Subtask 21-43-52-865-060-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-43-52-941-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
| 121VU | APU/FIRE/EXTIG/SQUIB/B | 2WF | L39 |
| 121VU | APU/FIRE/EXTIG/SQUIB/A | 1WF | L38 |
| 122VU | AIR COND/AFT CARGO VENT/FAN | 30HN | S22 |
C. Safety Precautions
(1) Put the WARNING NOTICE(S) in the cockpit to tell persons not to start the APU.
(2) In the cockpit, on AIR COND panel 30VU, make sure that:
(3) On the HP ground connector, put the WARNING NOTICE(S) in position to tell persons not to supply the ground air.
Subtask 21-43-52-010-050-A ** ON A/C NOT FOR ALL (1) Put the WARNING NOTICE(S) in the cockpit to tell persons not to start the APU.
(2) In the cockpit, on AIR COND panel 30VU, make sure that:
- The APU BLEED pushbutton switch is released (the OFF legend is on).
- The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
(3) On the HP ground connector, put the WARNING NOTICE(S) in position to tell persons not to supply the ground air.
D. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access panel 197BB.
(2) Remove the access panel 197BB (Ref. AMM TASK 53-35-13-000-002).
Subtask 21-43-52-010-050-C ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access panel 197BB.
(2) Remove the access panel 197BB (Ref. AMM TASK 53-35-13-000-002).
D. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access panel 197KB.
(2) Remove the access panel 197KB (Ref. AMM TASK 53-35-13-000-002).
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access panel 197KB.
(2) Remove the access panel 197KB (Ref. AMM TASK 53-35-13-000-002).
Subtask 21-43-52-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Pressure Regulating Valve
(1) Disconnect the electrical connector (31).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Disconnect the sense line (29).
(4) Put the PLUG-BLANKING in each disconnected line end.
(5) Remove the nut (10), the washer (11), the screw (13) and disconnect the bonding straps (7) and (12).
(6) Remove the nuts (4), the washers (3), the bolts (2) and disconnect the tie-rods (1) and (5).
(7) Remove the nut (9), the washer (8), the screw (6) and remove and retain the bonding strap (7).
(8) Hold the pressure regulating valve (30) together with the pipe assembly (27) and remove the clamps (26) and (33).
(9) Remove the regulating valve (30) and the pipe assembly (27) from the aircraft.
(10) Remove the O-rings (25).
(11) Remove the clamp (28) and move apart the pressure regulating valve (30) and the pipe assembly (27).
(12) Remove the O-ring (25).
(13) Put protective covers on the open ends of the ducts (24) and (32), the pipe assembly (27) and the regulating valve (30).
(14) On the pressure regulating valve (30) move and lock the manual override and position indicator (14) in the closed position.
(1) Disconnect the electrical connector (31).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Disconnect the sense line (29).
(4) Put the PLUG-BLANKING in each disconnected line end.
(5) Remove the nut (10), the washer (11), the screw (13) and disconnect the bonding straps (7) and (12).
(6) Remove the nuts (4), the washers (3), the bolts (2) and disconnect the tie-rods (1) and (5).
(7) Remove the nut (9), the washer (8), the screw (6) and remove and retain the bonding strap (7).
(8) Hold the pressure regulating valve (30) together with the pipe assembly (27) and remove the clamps (26) and (33).
(9) Remove the regulating valve (30) and the pipe assembly (27) from the aircraft.
(10) Remove the O-rings (25).
(11) Remove the clamp (28) and move apart the pressure regulating valve (30) and the pipe assembly (27).
(12) Remove the O-ring (25).
(13) Put protective covers on the open ends of the ducts (24) and (32), the pipe assembly (27) and the regulating valve (30).
(14) On the pressure regulating valve (30) move and lock the manual override and position indicator (14) in the closed position.
Pressure Regulating Valve - Component Location