Removal of the Cabin Recirculation Fans
TASK 21-21-51-000-001-A
Removal of the Cabin Recirculation Fans
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-21-51-861-050-A Subtask 21-21-51-865-050-A
Subtask 21-21-51-020-051-A
[Rev.10 from 2021]
2026.04.01 04:53:06 UTC
Removal of the Cabin Recirculation Fans
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE: The procedure is the same for the cabin recirculation fans 15HG and 14HG.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 825 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 25-54-12-000-001-A | Removal of the Forward Cargo-Compartment Partition |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| FOR [14HG] (RECIRC FAN 2) | |
| TASK 06-41-53-00 | FUSELAGE-DESCRIPTION AND OPERATION |
| FOR [15HG] (RECIRC FAN 1) | |
| TASK 06-41-53-00 | FUSELAGE-DESCRIPTION AND OPERATION |
Subtask 21-21-51-861-050-A Subtask 21-21-51-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-21-51-941-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 15HG (RECIRC FAN 1) | |||
| 122VU | AIR COND/RECIRC FAN/L/CTL | 2HG | X20 |
| 122VU | AIR COND/RECIRC FAN/L/SPLY | 1HG | X18 |
| FOR FIN: 14HG (RECIRC FAN 2) | |||
| 122VU | AIR COND/RECIRC FAN/R/CTL | 11HG | W20 |
| 122VU | AIR COND/RECIRC FAN/R/SPLY | 3HG | W18 |
C. Safety Precautions
(1) On the panel 30VU:
(a) Make sure that:
(2) On the HP and the LP ground connector put a warning notice in position to tell persons not to supply the ground air.
Subtask 21-21-51-010-050-A (1) On the panel 30VU:
(a) Make sure that:
- The APU BLEED pushbutton switch is in the off position (the ON legend is off) and
- the ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
(2) On the HP and the LP ground connector put a warning notice in position to tell persons not to supply the ground air.
D. Get Access
(1) Open the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) in position at the FWD cargo-compartment door 825.
(3) Remove the access panel at partition FR34 (Ref. AMM TASK 25-54-12-000-001).
(a) FOR [15HG] (RECIRC FAN 1)
(b) FOR [14HG] (RECIRC FAN 2)
4. Procedure(1) Open the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) in position at the FWD cargo-compartment door 825.
(3) Remove the access panel at partition FR34 (Ref. AMM TASK 25-54-12-000-001).
(a) FOR [15HG] (RECIRC FAN 1)
(b) FOR [14HG] (RECIRC FAN 2)
Subtask 21-21-51-020-051-A
A. Removal of the Cabin Recirculation Fan
(1) Disconnect the electrical connector (14).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Remove the bolt (8), the washers (9) and (11), the nut (12) and disconnect the bonding strap (10).
(4) Remove the clamp (2) and disconnect the sleeve (1).
(5) Remove the clamp (13).
(6) Hold the cabin recirculation fan (15) and remove the nuts (6), the washers (5), the bolts (3) and the washers (4).
(7) Carefully remove the cabin recirculation fan (15).
(8) Put PLUG - BLANKING on the open ends of the cabin recirculation fan (15), the sleeve (1) and on the check valve (7).
(1) Disconnect the electrical connector (14).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Remove the bolt (8), the washers (9) and (11), the nut (12) and disconnect the bonding strap (10).
(4) Remove the clamp (2) and disconnect the sleeve (1).
(5) Remove the clamp (13).
(6) Hold the cabin recirculation fan (15) and remove the nuts (6), the washers (5), the bolts (3) and the washers (4).
(7) Carefully remove the cabin recirculation fan (15).
(8) Put PLUG - BLANKING on the open ends of the cabin recirculation fan (15), the sleeve (1) and on the check valve (7).
Cabin Recirculation Fan 15HG (14HG)