W DOC AIRBUS | AMM A320F

GENERAL VISUAL INSPECTION OF FWD CABIN UTILITY AREA OVERHEAD COMPARTMENT (EWIS)


TASK 05-22-20-200-003-A
GENERAL VISUAL INSPECTION OF FWD CABIN UTILITY AREA OVERHEAD COMPARTMENT (EWIS)


ZONE: 223
ZONE: 224
1. Reason for the Job
Refer to the MPD TASK: ZL-223-01
GENERAL VISUAL INSPECTION OF FWD CABIN UTILITY AREA OVERHEAD COMPARTMENT (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
223
FWD CAB OVERHEAD COMPARTMENT
224
FWD CAB OVERHEAD COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 25-23-42-000-001-A
Removal of the Ceiling Panels - Forward Utility Area
TASK 25-23-42-400-001-A
Installation of the Ceiling Panels - Forward Utility Area
TASK 25-24-41-000-001-A
Removal of the Overhead Stowage Compartments (OHSC)
TASK 25-24-41-400-001-A
Installation of the Overhead Stowage Compartments (OHSC)
TASK 52-10-00-010-001-A
Opening of the Passenger/Crew Door
TASK 52-10-00-410-001-A
Closing of the Passenger/Crew Door
TASK 25-31-00-00
FORWARD GALLEY - DESCRIPTION AND OPERATION
TASK 25-41-00-00
FORWARD LAVATORIES - DESCRIPTION AND OPERATION
3. Job Set-up
Subtask 05-22-20-010-052-A
A. Get Access
   (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the zone 831 (841).
   (2) Open forward passenger/crew door 831 (841) (Ref. AMM TASK 52-10-00-010-001).
   (3) Remove the galleys and the lavatories between FR12 and FR20, if installed.
To do this, refer to the paragraph Component Location in the applicable ATA 25 Description/Operation:
In this paragraph, you will find the cross-references of the removal/installation tasks.
   (4) Remove the overhead stowage compartment between FR12 and FR20, if installed
(Ref. AMM TASK 25-24-41-000-001).
   (5) Remove the ceiling panels between FR12 and FR20
(Ref. AMM TASK 25-23-42-000-001).
   (6) Lift the insulation blankets between FR12 and FR20 to do the inspection.
4. Procedure
Subtask 05-22-20-210-052-A
A. Do a general visual inspection of the forward cabin utility-area overhead-compartment.
Make sure that:
  • There is no damage (corrosion, leaks or cracks) on all the parts of the components and the structure you can see.
  • All the installations (wiring, ducting) are attached correctly.
5. Close-up
Subtask 05-22-20-410-052-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Put the insulation blankets back in position between FR12 and FR20.
   (3) Install the ceiling panels between FR12 and FR20
(Ref. AMM TASK 25-23-42-400-001).
   (4) Install the overhead stowage compartment between FR12 and FR20, if removed
(Ref. AMM TASK 25-24-41-400-001).
   (5) Install the galleys and the lavatories between FR12 and FR20, if removed.
To do this, refer to the paragraph Component Location in the applicable ATA 25 Description/Operation:
In this paragraph, you will find the cross-references of the removal/installation tasks.
   (6) Close forward passenger/crew door 831 (841) (Ref. AMM TASK 52-10-00-410-001).
   (7) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 22:49:14 UTC