W DOC AIRBUS | AMM A320F

GENERAL VISUAL INSPECTION OF REAR FAIRING (EWIS)


TASK 05-21-90-200-007-A
GENERAL VISUAL INSPECTION OF REAR FAIRING (EWIS)


ZONE: 197
ZONE: 198
1. Reason for the Job
Refer to the MPD TASK: ZL-197-01
GENERAL VISUAL INSPECTION OF REAR FAIRING (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
197
REAR FAIRING
198
REAR FAIRING
197AB, 197GB
197KB, 198KB
197BB, 198BB
198MB, 826CR, 826DR
198GB
826GR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 53-35-13-000-001-A
Removal of the Belly Fairing Access Panels
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-001-A
Installation of the Belly Fairing Access Panels
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
3. Job Set-up
Subtask 05-21-90-010-056-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at zones 197 and 198.
   (2) Remove the access panels:
197AB 197GB 198GB (Ref. AMM TASK 53-35-13-000-001) and 826GR,
197BB 198BB (Ref. AMM TASK 53-35-13-000-002).
Subtask 05-21-90-010-056-B ** ON A/C NOT FOR ALL
A. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at zones 197 and 198.
   (2) Remove the access panels:
197AB 197GB 198GB (Ref. AMM TASK 53-35-13-000-001),
197KB 198KB (Ref. AMM TASK 53-35-13-000-002).
Subtask 05-21-90-010-056-C ** ON A/C NOT FOR ALL
A. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at zones 197 and 198.
   (2) Remove the access panels:
826DR, 826CR, 197AB 197GB, 197BB, 198BB and 198MB (Ref. AMM TASK 53-35-13-000-001).
4. Procedure
Subtask 05-21-90-210-056-A
A. Inspection
   (1) Do a general visual inspection of the rear fairing.
   (2) Make sure that there are no signs of corrosion, cracks or damage.
   (3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
Subtask 05-21-90-410-056-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the access panels:
197AB 197GB 198GB (Ref. AMM TASK 53-35-13-400-001), 826GR,
198BB 197BB. (Ref. AMM TASK 53-35-13-400-002)
   (2) Remove the access platform(s).
Subtask 05-21-90-410-056-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the access panels:
197AB 197GB 198GB (Ref. AMM TASK 53-35-13-400-001)
197KB 198KB. (Ref. AMM TASK 53-35-13-400-002)
   (2) Remove the access platform(s).
Subtask 05-21-90-410-056-C ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the access panels:
826DR, 826CR, 197AB 197GB, 197BB, 198BB and 198MB (Ref. AMM TASK 53-35-13-400-001).
   (2) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 22:49:05 UTC