General Visual Inspection of Bulk Cargo Compartment (EWIS)
TASK 05-21-60-200-004-A
General Visual Inspection of Bulk Cargo Compartment (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-161-03
GENERAL VISUAL INSPECTION OF BULK CARGO COMPARTMENT (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-21-60-010-053-B ** ON A/C NOT FOR ALL
Subtask 05-21-60-210-053-A
Subtask 05-21-60-410-053-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 22:48:58 UTC
General Visual Inspection of Bulk Cargo Compartment (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-161-03
GENERAL VISUAL INSPECTION OF BULK CARGO COMPARTMENT (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 161 | BULK CARGO COMPARTMENT |
| 162 | BULK CARGO COMPARTMENT |
| 826 | |
| 827 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-000-002-A | Removal of the Ceiling Panels in the Aft Cargo Compartment at FR59/FR65 |
| TASK 25-55-12-000-003-A | Removal of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-002-A | Installation of the Ceiling Panels in the Aft Cargo Compartment at FR59/FR65 |
| TASK 25-55-12-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-006-A | Open the Bulk Cargo-Compartment Door |
| TASK 52-30-00-860-008-A | Close the Bulk Cargo-Compartment Door |
| TASK 53-42-17-000-001-A | Removal of the Bulk Cargo-Compartment Floor-Panels |
| TASK 53-42-17-400-001-A | Installation of the Bulk Cargo-Compartment Floor-Panels |
| TASK 53-42-17-400-001-A-01 | Installation of the Bulk Cargo-Compartment Floor-Panels (Alternative Installation Procedure with the Skyflex Option) |
Subtask 05-21-60-010-053-B ** ON A/C NOT FOR ALL
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 826.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the ceiling panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-000-002).
(4) Remove the sidewall panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-000-003).
(5) Remove the partition panels at FR65 (Ref. AMM TASK 25-55-12-000-001).
(6) Remove the floor panels between FR59 and FR65 (Ref. AMM TASK 53-42-17-000-001).
(7) Lift the insulation blankets sufficiently to do the inspection.
Subtask 05-21-60-010-053-C ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 826.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the ceiling panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-000-002).
(4) Remove the sidewall panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-000-003).
(5) Remove the partition panels at FR65 (Ref. AMM TASK 25-55-12-000-001).
(6) Remove the floor panels between FR59 and FR65 (Ref. AMM TASK 53-42-17-000-001).
(7) Lift the insulation blankets sufficiently to do the inspection.
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at zones 826 and 827.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(3) Open bulk cargo-compartment door 827 (Ref. AMM TASK 52-30-00-860-006).
(4) Remove the ceiling panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-000-002).
(5) Remove the sidewall panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-000-003).
(6) Remove the partition panels at FR65 (Ref. AMM TASK 25-55-12-000-001).
(7) Remove the floor panels between FR59 and FR65 (Ref. AMM TASK 53-42-17-000-001).
(8) Lift the insulation blankets sufficiently to do the inspection.
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at zones 826 and 827.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(3) Open bulk cargo-compartment door 827 (Ref. AMM TASK 52-30-00-860-006).
(4) Remove the ceiling panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-000-002).
(5) Remove the sidewall panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-000-003).
(6) Remove the partition panels at FR65 (Ref. AMM TASK 25-55-12-000-001).
(7) Remove the floor panels between FR59 and FR65 (Ref. AMM TASK 53-42-17-000-001).
(8) Lift the insulation blankets sufficiently to do the inspection.
Subtask 05-21-60-210-053-A
A. Inspection
(1) Do a general visual inspection of the bulk cargo compartment (zones 161 and 162).
(2) Make sure that:
5. Close-up(1) Do a general visual inspection of the bulk cargo compartment (zones 161 and 162).
(2) Make sure that:
- There is no damage (corrosion, leaks or cracks) on all the parts of the components and the structure that you can see.
- All the installations (wiring, ducting and piping) are correctly attached.
Subtask 05-21-60-410-053-B ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the insulation blankets back in position.
(3) Install the floor panels between FR59 and FR65 (Ref. AMM TASK 53-42-17-400-001).
(4) Install the partition panels at FR65 (Ref. AMM TASK 25-55-12-400-001).
(5) Install the sidewall panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-400-003).
(6) Install the ceiling panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-400-002).
(7) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(8) Remove the access platform(s).
Subtask 05-21-60-410-053-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the insulation blankets back in position.
(3) Install the floor panels between FR59 and FR65 (Ref. AMM TASK 53-42-17-400-001).
(4) Install the partition panels at FR65 (Ref. AMM TASK 25-55-12-400-001).
(5) Install the sidewall panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-400-003).
(6) Install the ceiling panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-400-002).
(7) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(8) Remove the access platform(s).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the insulation blankets back in position.
(3) Install the floor panels between FR59 and FR65 (Ref. AMM TASK 53-42-17-400-001).
(4) Install the partition panels at FR65 (Ref. AMM TASK 25-55-12-400-001).
(5) Install the sidewall panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-400-003).
(6) Install the ceiling panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-400-002).
(7) Close bulk cargo-compartment door 827 (Ref. AMM TASK 52-30-00-860-008).
(8) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(9) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the insulation blankets back in position.
(3) Install the floor panels between FR59 and FR65 (Ref. AMM TASK 53-42-17-400-001).
(4) Install the partition panels at FR65 (Ref. AMM TASK 25-55-12-400-001).
(5) Install the sidewall panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-400-003).
(6) Install the ceiling panels between FR59 and FR65 (Ref. AMM TASK 25-55-12-400-002).
(7) Close bulk cargo-compartment door 827 (Ref. AMM TASK 52-30-00-860-008).
(8) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(9) Remove the access platform(s).