Installation of the C??Seal??Gaskets [CFML]
TASK 79-22-01-400-802-A
Installation of the C??Seal??Gaskets
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 79-22-01-941-055-A
Subtask 79-22-01-420-051-A
Subtask 79-22-01-410-053-A
[Rev.10 from 2021]
2026.04.01 03:43:22 UTC
Installation of the C??Seal??Gaskets
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1) | |
| 437AL, 438AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2) | |
| 447AL, 448AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 17 | C SEAL GASKET | EIPC 72-00-00-30-710 |
| 22 | FLANGE ASSY C SEAL | EIPC 72-00-00-33-040 |
| 27 | FLANGE ASSY C SEAL | EIPC 72-00-00-33-080 |
| 33 | C SEAL GASKET | EIPC 72-00-00-33-160 |
| 13 | FLANGE ASSY C SEAL | EIPC 72-00-00-33-480 |
| 7 | FLANGE ASSY C SEAL | EIPC 72-00-01-09-220 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-13-79-610-805-A | Check of the Oil Level and Replenishing |
| TASK 71-00-00-710-815-A | Idle Leak Check |
| TASK 71-13-00-010-803-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-803-A | Closing of the Fan Cowl Doors |
Subtask 79-22-01-941-055-A
A. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
Subtask 79-22-01-865-056-A (1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
- The ENG/MODE selector switch
- The ENG/MASTER 1(2) control switch.
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 79-22-01-010-058-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | ENGINE/1 AND 2/IGN/SYS A | 1JH | A03 |
| FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENGINE 1) | |||
| 121VU | ENGINE/IGN/ENG1/SYS B | 3JH1 | P41 |
| FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENGINE 2) | |||
| 121VU | ENGINE/IGN/ENG2/SYS B | 3JH2 | P42 |
C. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL, 438AR.
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL, 448AR.
4. Procedure(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL, 438AR.
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL, 448AR.
Subtask 79-22-01-420-051-A
A. Installation of the C Seal Gaskets
(1) Install all the C seal gaskets and the flange assy C seals between pipeline / pipeline interface as follows:
(a) Remove CAP - BLANKING or PLUG - BLANKING from the tubes and the openings.
(b) Installation of the flange assy C seal (7) and the flange assy C seal (13):
1 Install the new72000109-220 FLANGE ASSY C SEAL 7 between the flanges of the oil tube (8) and the oil tube (2).
2 Attach the oil tube (8) to the oil tube (2) with the four bolts (9) and the four nuts (10).
3 Tighten the four nuts (10) by hand.
4 Install the new72000033-480 FLANGE ASSY C SEAL 13 between the flanges of the oil tube (2) and the oil tube (12).
5 Attach the oil tube (2) to the oil tube (12) with the four bolts (14) and the four nuts (11).
6 Tighten the four nuts (11) by hand.
7 TORQUE the four nuts (10) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.
8 TORQUE the four nuts (11) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.
9 TORQUE the nut (1) that attach the clamp (3) to between 46.2 and 41.8 lbf.in (0.52 and 0.47 m.daN )
.
10 TORQUE the bolt (5) that attach the clamp (6) to between 46.2 and 41.8 lbf.in (0.52 and 0.47 m.daN )
.
(c) Installation of the C seal gasket (17):
1 Install the new72000030-710 C SEAL GASKET 17 between the flanges of the oil tube (19) and the oil tube (16).
2 Attach the oil tube (19) to the oil tube (16) with the four bolts (18) and the four nuts (15).
3 TORQUE the four nuts (15) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.
(d) Installation of the flange assy C seal (22):
1 Install the new72000033-040 FLANGE ASSY C SEAL 22 between the flanges of the oil tube (24) and the oil tube (20).
2 Attach the oil tube (24) to the oil tube (20) with the four bolts (23) and the four nuts (21).
3 TORQUE the four nuts (21) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.
(e) Installation of the flange assy C seal (27):
1 Install the new72000033-080 FLANGE ASSY C SEAL 27 between the flanges of the oil tube (28) and the oil tube (26).
2 Attach the oil tube (28) to the oil tube (26) with the four bolts (25) and the four nuts (29).
3 TORQUE the four nuts (29) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.
(f) Installation of the C seal gasket (33):
1 Install the new72000033-160 C SEAL GASKET 33 between the flanges of the oil tube (34) and the oil tube (32).
2 Attach the oil tube (34) to the oil tube (32) with the four bolts (31) and the four nuts (30).
3 TORQUE the four nuts (30) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.
Subtask 79-22-01-865-059-A (1) Install all the C seal gaskets and the flange assy C seals between pipeline / pipeline interface as follows:
(a) Remove CAP - BLANKING or PLUG - BLANKING from the tubes and the openings.
(b) Installation of the flange assy C seal (7) and the flange assy C seal (13):
1 Install the new
2 Attach the oil tube (8) to the oil tube (2) with the four bolts (9) and the four nuts (10).
3 Tighten the four nuts (10) by hand.
4 Install the new
5 Attach the oil tube (2) to the oil tube (12) with the four bolts (14) and the four nuts (11).
6 Tighten the four nuts (11) by hand.
7 TORQUE the four nuts (10) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.8 TORQUE the four nuts (11) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.9 TORQUE the nut (1) that attach the clamp (3) to between 46.2 and 41.8 lbf.in (0.52 and 0.47 m.daN )
.10 TORQUE the bolt (5) that attach the clamp (6) to between 46.2 and 41.8 lbf.in (0.52 and 0.47 m.daN )
.(c) Installation of the C seal gasket (17):
1 Install the new
2 Attach the oil tube (19) to the oil tube (16) with the four bolts (18) and the four nuts (15).
3 TORQUE the four nuts (15) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.(d) Installation of the flange assy C seal (22):
1 Install the new
2 Attach the oil tube (24) to the oil tube (20) with the four bolts (23) and the four nuts (21).
3 TORQUE the four nuts (21) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.(e) Installation of the flange assy C seal (27):
1 Install the new
2 Attach the oil tube (28) to the oil tube (26) with the four bolts (25) and the four nuts (29).
3 TORQUE the four nuts (29) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.(f) Installation of the C seal gasket (33):
1 Install the new
2 Attach the oil tube (34) to the oil tube (32) with the four bolts (31) and the four nuts (30).
3 TORQUE the four nuts (30) in a crisscross sequence to between 91 and 85 lbf.in (1.03 and 0.96 m.daN )
.WARNING:
USE PERSONAL PROTECTION EQUIPMENT. USE THE ENGINE OIL IN A WELL-VENTILATED AREA. ENGINE OIL IS TOXIC.
(g) Fill the oil tank (Ref. AMM TASK 12-13-79-610-805).B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 79-22-01-790-050-A 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | ENGINE/1 AND 2/IGN/SYS A | 1JH | A03 |
| FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENGINE 1) | |||
| 121VU | ENGINE/IGN/ENG1/SYS B | 3JH1 | P41 |
| FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENGINE 2) | |||
| 121VU | ENGINE/IGN/ENG2/SYS B | 3JH2 | P42 |
Subtask 79-22-01-410-053-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL, 438AR.
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL, 448AR.
(3) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL, 438AR.
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL, 448AR.
(3) Remove the WARNING NOTICE(S).
C Seal Gasket