Inspection/Check of the Oil Tank [CFMI]
TASK 79-11-10-200-001-A
Inspection/Check of the Oil Tank
1. Reason for the Job
To do the visual inspection of the tank envelope and a check for leakage.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 79-11-10-941-054-A ** ON A/C NOT FOR ALL
Subtask 79-11-10-210-050-A ** ON A/C NOT FOR ALL
Subtask 79-11-10-410-054-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 13:13:50 UTC
Inspection/Check of the Oil Tank
1. Reason for the Job
To do the visual inspection of the tank envelope and a check for leakage.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-A | Closing of the Fan Cowl Doors |
| TASK 79-11-10-300-001-A | Repair of the Oil Tank Silicone (RTV) Coating. |
| TASK 79-11-10-300-005-A | Replacement of the O-ring of the Oil Tank Filler Cap. |
| TASK 79-11-10-300-006-A | Replacement of the O-ring from the Oil Cap Assembly. |
Subtask 79-11-10-941-054-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 79-11-10-010-055-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Open the fan cowl doors: (Ref. AMM TASK 71-13-00-010-040)
(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 79-11-10-210-050-A ** ON A/C NOT FOR ALL
A. Do the Inspection Below:
Subtask 79-11-10-210-051-A ** ON A/C NOT FOR ALL | INSPECT/CHECK | MAXIMUM SERVICEABLE LIMITS | REMARKS |
|---|---|---|
1.Tank envelope for :
| Any number not penetrating through silicone coating. (Min. coating 0.40 in. (10.16 mm) None permitted exposing metal through silicone coating | Repair (Ref. AMM TASK 79-11-10-300-001) |
| Max. of 3 nicks or scratches 0.015 in. (0.38 mm) deep, 0.375 in. (9.53 mm) long, non joining provided damage cannot be left with 0.030 in. (0.76 mm) ball scriber. | |
| Any number not breaking metal surface or affecting the capacity of the tank. | |
| None permitted | |
| No loose coating or metal exposure is permitted | Repair (Ref. AMM TASK 79-11-10-300-001) |
B. Do a check for Leakage:
5. Close-up| INSPECT/CHECK | MAXIMUM SERVICEABLE LIMITS | REMARKS |
|---|---|---|
| 1.Check for leakage at following locations : | | |
| None permitted | |
| None permitted | Check torque on fittings |
| None permitted | |
| Not serviceable | Repair (Ref. AMM TASK 79-11-10-300-005) and (Ref. AMM TASK 79-11-10-300-006) |
Subtask 79-11-10-410-054-A ** ON A/C NOT FOR ALL