W DOC AIRBUS | AMM A320F

Installation of the Throttle Control Artificial Feel Unit [IAE]


TASK 76-11-17-400-041-A
Installation of the Throttle Control Artificial Feel Unit


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
WARNING NOTICE(S)
98D76103000002
1
MEASURE,LOAD-THROTTLE LEVER
98DNSA20206080
1
RIGGING PIN
98DNSA20208120
1
RIGGING PIN
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05ABF1)
Retaining adhesive-Cylindrical fitting Medium strength Low viscosity -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
811
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
13
COTTER PINS
AIPC 76-11-01-02-010
18
COTTER PINS
AIPC 76-11-01-02-010
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 22-82-12-400-002-A
Installation of the Multipurpose Control & Display Unit (MCDU)
TASK 23-13-13-400-001-A
Installation of the Radio Management Panel (RMP)
TASK 23-51-12-400-001-A
Installation of the Audio Control Panel (ACP)
TASK 34-41-12-400-001-A
Installation of the Weather-Radar Control Unit
TASK 34-52-12-400-001-A
Installation of the ATC/TCAS Control Unit
TASK 76-11-00-820-040-A
Adjustment of the Mechanical Linkage
TASK 76-11-00-820-041-A
Adjustment of the Artificial Feel Unit
3. Job Set-up
Subtask 76-11-17-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that a WARNING NOTICE(S) is in the cockpit to tell persons not to move:
the throttle control levers
the slat and flap control levers.
   (2) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
   (3) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
   (4) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
Subtask 76-11-17-010-058-A ** ON A/C NOT FOR ALL
B. Make sure that the access door 811 is open.
Subtask 76-11-17-865-054-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
49VULIGHTING/EMER LT/CKPT/DOME1LEH08
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUENGINE/IGN/ENG2/SYS A BAT2JH2P40
121VUENGINE/IGN/ENG1/SYS A BAT2JH1P39
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
122VULIGHTING/FLOOD/CTR INST/PNL2LEZ04
4. Procedure
Subtask 76-11-17-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the Throttle Control Artificial Feel Unit:
   (1) Install the throttle control artificial feel unit (23).
   (2) Install the 2 bolts (24), 2 washers (22) and 2 nuts (21).
   (3) If necessary bond the bushes (25) on the bolts (26) with Retaining adhesive-Cylindrical fitting Medium strength Low viscosity - (Material No.05ABF1) .
   (4) Install the 2 bolt assemblies (26), the 2 washers (20) and the 2 nuts (19).
   (5) Tighten the 4 nuts.
   (6) Install 4 new AIPC 76-11-01-02-010 COTTER PINS (18).
   (7) Install the 4 rods (27).
   (8) If necessary bond the 4 bushes (16) on the 4 bolts (17) with Retaining adhesive-Cylindrical fitting Medium strength Low viscosity - (Material No.
05ABF1)
   (9) Install the 4 bolt assemblies (17), the 4 washers (15) and the 4 nuts (14).
   (10) Tighten the 4 nuts.
Subtask 76-11-17-820-050-A ** ON A/C NOT FOR ALL
B. Precautions Before Adjustment.
   (1) Make sure that you can easily install and remove the rigging pin 98DNSA20208120 RIGGING PIN (12) in the artificial feel unit (23).
F Throttle Control Rigging ** ON A/C NOT FOR ALL
If you can not do this, adjust the length of the rod (Ref. AMM TASK 76-11-00-820-040).
   (2) Make sure that you can easily install and remove the rigging pin 98DNSA20206080 RIGGING PIN (11) in the throttle control unit.
F Throttle Control Rigging ** ON A/C NOT FOR ALL
If you can not do this, adjust the lenght of the rod (Ref. AMM TASK 76-11-00-820-040).
Subtask 76-11-17-420-053-A ** ON A/C NOT FOR ALL Subtask 76-11-17-080-050-A ** ON A/C NOT FOR ALL
D. Remove the rigging pin (12) from the artificial feel unit and the rigging pin (11) from the throttle control unit.
Subtask 76-11-17-480-051-A ** ON A/C NOT FOR ALL
E. Install the 98D76103000002 MEASURE,LOAD-THROTTLE LEVER on the throttle control levers.
Subtask 76-11-17-820-051-A ** ON A/C NOT FOR ALL
F. Adjustment of the Artificial Feel Unit.
   (1) Measure the value necessary to move the throttle control lever between the IDLE STOP and the MAX CLIMB.
This value must be 0.85 and 1.05 daN.
NOTE: Measure this value in the IDLE STOP to MAX CLIMB range. Do not measure this value at the friction point where the load increases suddenly.
   (2) Measure the value necessary to move to more than MAX CLIMB friction point.
This value must be 2.5 +0.1 -0 daN (5.62 +0.22 -0 lbf)
   (3) If you do not get these values, adjust the artificial feel unit (Ref. AMM TASK 76-11-00-820-041)
Subtask 76-11-17-080-051-A ** ON A/C NOT FOR ALL
G. Remove the tool from the throttle control levers.
Subtask 76-11-17-869-053-A ** ON A/C NOT FOR ALL
H. Installation After Adjustment.
   (1) Install the plates (4) and (10).
F Ventilation Plates and Clamps ** ON A/C NOT FOR ALL
   (2) Install the washers (5) and the screws (6).
   (3) Install the clamps (9).
   (4) Install the ventilation plates (8).
   (5) Install the screws (7).
   (6) Install the FLOOD LT/INTEG LT panel 111VU and the FLOOD LT panel 112VU:
F Panels 111VU and 112VU ** ON A/C NOT FOR ALL
NOTE: The installation procedure is the same for the panels 111VU and 112VU.
     (a) Remove the blanking caps from the connectors (2) and (3).
     (b) Install the connector (2) on the panel (1).
     (c) Install the panel (1) on the structure.
     (d) Fully tighten the fasteners on the panel (1).
   (7) Install the Multipurpose Control and Display Units (3CA1 and 3CA2). (Ref. AMM TASK 22-82-12-400-002).
   (8) Install the Radio Management Panels (1RG1 and 1RG2) (Ref. AMM TASK 23-13-13-400-001).
   (9) Install the Audio Control Panels (2RN1 and 2RN2) (Ref. AMM TASK 23-51-12-400-001).
   (10) Install the Weather Radar Control Unit (3SQ) (Ref. AMM TASK 34-41-12-400-001).
   (11) Install the ATC Control Unit (3SH) (Ref. AMM TASK 34-52-12-400-001)
5. Close-up
Subtask 76-11-17-410-054-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the access platform(s).
   (3) Close the access door 811
   (4) Remove the WARNING NOTICE(S).
Subtask 76-11-17-865-055-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
49VULIGHTING/EMER LT/CKPT/DOME1LEH08
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUENGINE/IGN/ENG2/SYS A BAT2JH2P40
121VUENGINE/IGN/ENG1/SYS A BAT2JH1P39
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
122VULIGHTING/FLOOD/CTR INST/PNL2LEZ04
Subtask 76-11-17-710-051-A ** ON A/C NOT FOR ALL
C. Do an operational test of the FLOOD LT/INTEG LT panel 111VU and FLOOD LT panel 112VU:
   (1) operate the light adjustment knobs of the panels 111VU and 112VU.
   (2) Make sure that the light intensity of the panels 13VU, 130VU, 131VU and 48VU changes.
[Rev.10 from 2021] 2026.04.01 03:15:46 UTC