Installation of the HPC Stage 10 Bleed Valve [IAE]
TASK 75-32-54-400-010-A
Installation of the HPC Stage 10 Bleed Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 75-32-54-860-050-A ** ON A/C NOT FOR ALL
Subtask 75-32-54-420-050-A ** ON A/C NOT FOR ALL
Subtask 75-32-54-410-053-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 13:00:40 UTC
Installation of the HPC Stage 10 Bleed Valve
FIN: 4001JM ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.V02-126) | lockwire |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 70-23-11-911-013-A | General Torque Tightening Techniques |
| TASK 70-40-11-911-014-A | Locking Devices General Information |
| TASK 71-00-00-710-017-B | Ground Test Requirements after Power Plant Module/Component Repair or Replacement Procedures |
| TASK 71-13-00-010-010-A | Opening of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 71-13-00-410-010-A | Closing of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 75-32-54-700-011-A | Functional Test of the HPC Stage 10 Bleed Valve with Test Set IAE2R19437 |
| TASK 78-30-00-040-012-A | Deactivation of the Thrust Reverser Hydraulic Control Unit (HCU) for Ground Maintenance |
| TASK 78-30-00-440-012-A | Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance |
| TASK 78-32-00-010-010-A | Opening of the Thrust Reverser Halves |
| TASK 78-32-00-410-010-A | Closing of the Thrust Reverser Halves |
Subtask 75-32-54-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 75-32-54-010-054-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 75-32-54-040-051-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
C. Make sure that the thrust reverser Hydraulic Control Unit (HCU) is deactivated (Ref. AMM TASK 78-30-00-040-012).
Subtask 75-32-54-630-050-A ** ON A/C NOT FOR ALL D. Remove all the covers/caps/plugs from the openings.
Subtask 75-32-54-110-050-A ** ON A/C NOT FOR ALL E. Make sure all the mating faces are clean.
4. ProcedureSubtask 75-32-54-420-050-A ** ON A/C NOT FOR ALL
A. Install the HPC Stage 10 Bleed Valve 4001JM
(1) Install the bleed valve.
(a) Put the bleed valve (7) in position on the support duct.
(b) Align the air operation connection on the bleed valve with the air operation tube (8).
(2) Attach the brackets to the support duct flange.
(a) Position the two brackets (1) and (2) on the support duct.
(b) Attach the brackets with the nuts (10) and the bolts (9).
(3) TORQUE the 12 nuts (10) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(4) Connect the air operation tube.
(a) Attach the air operation tube (8) to the connection on the bleed valve (7).
(b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(c) Safety the connector with the lockwire (Material No.V02-126) (Ref. AMM TASK 70-40-11-911-014).
Subtask 75-32-54-410-050-A ** ON A/C NOT FOR ALL (1) Install the bleed valve.
(a) Put the bleed valve (7) in position on the support duct.
(b) Align the air operation connection on the bleed valve with the air operation tube (8).
NOTE: Make sure the air operation connection on the bleed valve is in the correct position. The bleed valve can be installed in two positions.
(c) Attach the bleed valve to the support duct with the eight bolts (9) and the eight nuts (10). NOTE: Do not install nuts and bolts through the bolt holes where the two brackets (1) and (2) are to be installed.
(d) Do not tighten the eight nuts (10) at this step. (2) Attach the brackets to the support duct flange.
(a) Position the two brackets (1) and (2) on the support duct.
(b) Attach the brackets with the nuts (10) and the bolts (9).
(3) TORQUE the 12 nuts (10) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (4) Connect the air operation tube.
(a) Attach the air operation tube (8) to the connection on the bleed valve (7).
(b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (c) Safety the connector with the lockwire (Material No.V02-126) (Ref. AMM TASK 70-40-11-911-014).
B. Install the Seal Carrier and the Silencer
Pre SBE 75-0072 and Pre SBE 75-0093
(1) Hold the seal carrier (4) and the silencer (6) in position on the bleed valve (7).
(2) Attach the seal carrier (4) and the silencer (6) to the bleed valve (7) with the bolts (5) and the nuts (3).
(3) TORQUE the bolts to between 1.18 and 0.96 m.daN (104.42 and 84.96 lbf.in )
(Ref. AMM TASK 70-23-11-911-013).
SBE 75-0072 and Pre SBE 75-0093
(4) Hold the seal carrier and silencer assembly (11) in position on the bleed valve (7).
(5) Attach the seal carrier and silencer assembly (11) to the bleed valve (7) with the bolts (12) and the nuts (3).
(6) TORQUE the bolts to between 1.18 and 0.96 m.daN (104.42 and 84.96 lbf.in )
(Ref. AMM TASK 70-23-11-911-013).
SBE 75-0093
(7) Hold the silencer assembly (13) in position on the bleed valve (7).
(8) Attach the silencer assembly (13) to the bleed valve (7) with the bolts (5) and the nuts (3).
(9) TORQUE the bolts (5) to between 1.18 and 0.96 m.daN (104.42 and 84.96 lbf.in )
(Ref. AMM TASK 70-23-11-911-013).
5. Close-upPre SBE 75-0072 and Pre SBE 75-0093
(1) Hold the seal carrier (4) and the silencer (6) in position on the bleed valve (7).
(2) Attach the seal carrier (4) and the silencer (6) to the bleed valve (7) with the bolts (5) and the nuts (3).
(3) TORQUE the bolts to between 1.18 and 0.96 m.daN (104.42 and 84.96 lbf.in )
(Ref. AMM TASK 70-23-11-911-013). SBE 75-0072 and Pre SBE 75-0093
(4) Hold the seal carrier and silencer assembly (11) in position on the bleed valve (7).
(5) Attach the seal carrier and silencer assembly (11) to the bleed valve (7) with the bolts (12) and the nuts (3).
(6) TORQUE the bolts to between 1.18 and 0.96 m.daN (104.42 and 84.96 lbf.in )
(Ref. AMM TASK 70-23-11-911-013). SBE 75-0093
(7) Hold the silencer assembly (13) in position on the bleed valve (7).
(8) Attach the silencer assembly (13) to the bleed valve (7) with the bolts (5) and the nuts (3).
(9) TORQUE the bolts (5) to between 1.18 and 0.96 m.daN (104.42 and 84.96 lbf.in )
(Ref. AMM TASK 70-23-11-911-013). Subtask 75-32-54-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser halves (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 75-32-54-440-050-A ** ON A/C NOT FOR ALL Subtask 75-32-54-410-051-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser halves (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
C. Close Access
(1) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
Subtask 75-32-54-720-050-B ** ON A/C NOT FOR ALL (1) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
D. For Test Requirements
(1) Do a test of the HPC bleed valve (Ref. AMM TASK 75-32-54-700-011) or (Ref. AMM TASK 71-00-00-710-017).
(1) Do a test of the HPC bleed valve (Ref. AMM TASK 75-32-54-700-011) or (Ref. AMM TASK 71-00-00-710-017).
HP Compressor Stage 10 Bleed Valve