Installation of the HJ12 Harness for SAC Engines [CFMB]
TASK 73-21-50-400-045-A
Installation of the HJ12 Harness for SAC Engines
1. Reason for the Job
This task is applicable for SAC Engines.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 73-21-50-860-068-A ** ON A/C NOT FOR ALL
Subtask 73-21-50-420-073-A ** ON A/C NOT FOR ALL
Subtask 73-21-50-410-092-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:59:05 UTC
Installation of the HJ12 Harness for SAC Engines
1. Reason for the Job
This task is applicable for SAC Engines.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | PLIERS - CONNECTOR, JAW, SOFT |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 53 and 47 lbf.in (0.60 and 0.53 m.daN ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2101) | graphite grease |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 73-29-00-710-040-B | Operational Test of the FADEC on the Ground (with Engine Motoring) |
| TASK 73-29-00-710-040-B-02 | Operational Test of the FADEC on the Ground (with Engine Non motoring) |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
Subtask 73-21-50-860-068-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
Subtask 73-21-50-010-137-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open (Ref. AMM TASK 78-36-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 73-21-50-040-091-A ** ON A/C NOT FOR ALL 4. Procedure(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open (Ref. AMM TASK 78-36-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 73-21-50-420-073-A ** ON A/C NOT FOR ALL
A. Installation of the HJ12 Harness
(2) Make sure that all the electrical connections are clean and in the correct condition.
(3) Install the HJ12 harness in position on the fan frame.
(4) Connect the HJ12 harness to the CJ12R and CJ12L harness bulkhead connectors in the 6 o'clock tube bundle junction box, and to the ECU (receptacle J12). Use PLIERS - CONNECTOR, JAW, SOFT only if necessary.
(5) Make sure that the connectors are fully engaged and do not move.
(6) Make sure that the harness is not stressed.
(7) Engage the HJ12 harness in the flexible clamp (240), on fan frame between flange E and flange F at the 5 o'clock position (Detail D).
(8) Engage the HJ12 harness in the flexible clamp (40), on fan frame between flange E and flange F at the 5:45 o'clock position (Detail E).
(9) Engage the HJ12 harness in the flexible clamps (190), (80), (120) on TGB (Details F, G, H).
(10) Engage the HJ12 harness in the clip assembly (100) on the No. 7 strut (3 locations) (Detail J).
(11) Lubricate the threads of the bolts with graphite grease (Material No.CP2101) .
(12) Install the parts which attach the HJ12 harness as follows:
PRE SB CFM56-5 72-079
(13) TORQUE the nuts (230) and bolts (20), (60), (160), (170) to between 53 and 47 lbf.in (0.60 and 0.53 m.daN )
.
POST SB CFM56-5 72-079
(14) TORQUE the nuts (230), (260) and bolts (20), (60), (160), (170) to between 53 and 47 lbf.in (0.60 and 0.53 m.daN )
.
END OF SB CFM56-5 72-079
Subtask 73-21-50-710-073-A ** ON A/C NOT FOR ALL 5. Close-upCAUTION:
CAREFULLY ALIGN THE CONNECTOR KEY WITH THE RECEPTACLE KEYWAY BEFORE YOU CONNECT THEM TO PREVENT DAMAGE TO THE CONNECTORS.
CAUTION:
DISTRIBUTE THE SLACK ALL ALONG THE CABLE. DO NOT LET THE CABLE SHEATH TOUCH THE ADJACENT COMPONENTS. DO NOT TWIST THE SHEATH BY MORE THAN 180 DEGREES.
(1) Remove the CAP-BLANKING from each electrical connector and receptacle.(2) Make sure that all the electrical connections are clean and in the correct condition.
(3) Install the HJ12 harness in position on the fan frame.
(4) Connect the HJ12 harness to the CJ12R and CJ12L harness bulkhead connectors in the 6 o'clock tube bundle junction box, and to the ECU (receptacle J12). Use PLIERS - CONNECTOR, JAW, SOFT only if necessary.
(5) Make sure that the connectors are fully engaged and do not move.
(6) Make sure that the harness is not stressed.
(7) Engage the HJ12 harness in the flexible clamp (240), on fan frame between flange E and flange F at the 5 o'clock position (Detail D).
(8) Engage the HJ12 harness in the flexible clamp (40), on fan frame between flange E and flange F at the 5:45 o'clock position (Detail E).
(9) Engage the HJ12 harness in the flexible clamps (190), (80), (120) on TGB (Details F, G, H).
(10) Engage the HJ12 harness in the clip assembly (100) on the No. 7 strut (3 locations) (Detail J).
(11) Lubricate the threads of the bolts with graphite grease (Material No.CP2101) .
(12) Install the parts which attach the HJ12 harness as follows:
| INSTALL | ON | NOTE |
|---|---|---|
| Plates (250) Bolts (220) Nuts (230) | Bracket assembly (210) | On fan frame between flange E and flange F at the 5 o'clock position (Detail D) |
| Cover plate (50) Bolts (20) | Clamp (10) on bracket (30) | On fan frame between flange E and flange F at the 5:45 o'clock position (Detail E) |
| Cover plate (200) Bolts (170) | Bracket (180) | On TGB right-hand side (Detail F) |
| Cover plate (70) Bolts (60) | Bracket (90) | On TGB right-hand side (Detail G) |
| PRE SB CFM56-5 72-079 Cover plate (150) Bolts (160) | Bracket (110) with Clamp (130) and bracket (140) | On TGB rear face (Detail H) |
| POST SB CFM56-5 72-079 Cover plate (150) Bolts (160) | Bracket (110) with bracket (140) | On TGB rear face (Detail H) |
| Clamp (280) Bolt (270) Nut (260) END OF SB CFM56-5 72-079 | Bracket (290) | On TGB rear face (Detail H) |
(13) TORQUE the nuts (230) and bolts (20), (60), (160), (170) to between 53 and 47 lbf.in (0.60 and 0.53 m.daN )
. POST SB CFM56-5 72-079
(14) TORQUE the nuts (230), (260) and bolts (20), (60), (160), (170) to between 53 and 47 lbf.in (0.60 and 0.53 m.daN )
. END OF SB CFM56-5 72-079
Subtask 73-21-50-410-092-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 73-21-50-440-082-A ** ON A/C NOT FOR ALL Subtask 73-21-50-410-110-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
HJ12 Harness