Installation of the Burner Selection Valve (BSV) [CFMI]
TASK 73-11-70-400-001-A
Installation of the Burner Selection Valve (BSV)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 73-11-70-860-050-A ** ON A/C NOT FOR ALL
Subtask 73-11-70-420-050-A ** ON A/C NOT FOR ALL
Subtask 73-11-70-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:54:45 UTC
Installation of the Burner Selection Valve (BSV)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | PLIERS - JAWED, SOFT |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 70 and 55 lbf.in (0.79 and 0.62 m.daN ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2101) | graphite grease |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 20 | GASKET | AIPC 73-11-70-01-050 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 70-21-00-918-001-A | Seals (Preformed Packings and O-rings) and Gaskets |
| TASK 71-00-00-710-006-A | Minimum Idle Check |
| TASK 71-13-00-010-040-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-A | Closing of the Fan Cowl Doors |
| TASK 73-29-00-710-040-A-01 | FADEC Ground Test Without the CFDS |
| TASK 73-29-00-710-040-A | Operational Test of the FADEC on the ground (with Engine Motoring) |
| TASK 73-29-00-710-040-A-01 | FADEC Ground Test Without the CFDS |
| TASK 73-29-00-710-040-A-02 | Operational Test of the FADEC on the Ground (with Engine non Motoring) |
| TASK 78-30-00-081-041-A | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-A | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-A | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-A | Closing of the Thrust Reverser Doors |
Subtask 73-11-70-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
Subtask 73-11-70-010-052-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open: (Ref. AMM TASK 78-36-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 73-11-70-040-051-A ** ON A/C NOT FOR ALL 4. Procedure(1) Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open: (Ref. AMM TASK 78-36-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 73-11-70-420-050-A ** ON A/C NOT FOR ALL
A. Install the Burner Staging Valve as follows:
(1) Do an inspection of the AIPC 73-11-70-01-050 GASKET (20) (Ref. AMM TASK 70-21-00-918-001).
(2) Remove the protective covers from the BSV (70) and the fuel supply manifold.
(3) Install the gasket (20) between the BSV (70) and the fuel supply manifold.
(4) Install the BSV (70) on the fuel supply manifold.
Subtask 73-11-70-640-050-A ** ON A/C NOT FOR ALL Subtask 73-11-70-420-052-A ** ON A/C NOT FOR ALL (1) Do an inspection of the AIPC 73-11-70-01-050 GASKET (20) (Ref. AMM TASK 70-21-00-918-001).
(2) Remove the protective covers from the BSV (70) and the fuel supply manifold.
(3) Install the gasket (20) between the BSV (70) and the fuel supply manifold.
(4) Install the BSV (70) on the fuel supply manifold.
C. Attach BSV, as follows:
PRE SB 73-121
(1) Install the bolts (10) with the heads up.
(2) Install the nuts (30) to the bolts (10).
(3) Install the bolts (40) with the heads down.
(4) Install the nuts (80) to the bolts (40).
(5) TORQUE the nuts (30, 80) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
(6) Remove the protective caps from the electrical connectors.
END PRE SB 73-121
POST SB 73-121
(7) Install the bolt (10) and bolt (40) in the aft end of BSV.
(8) Install the nut (30) to the bolt (10).
(9) Install the nut (80) to the bolt (40).
(10) Install the bolt (10) and bolt (40) in the fuel support bracket.
(11) TORQUE the nuts (30, 80) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
(12) TORQUE bolts (10, 40) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
(13) Remove the protective caps from the electrical connectors.
END POST SB 73-121
Subtask 73-11-70-420-051-A ** ON A/C NOT FOR ALL PRE SB 73-121
(1) Install the bolts (10) with the heads up.
(2) Install the nuts (30) to the bolts (10).
(3) Install the bolts (40) with the heads down.
(4) Install the nuts (80) to the bolts (40).
(5) TORQUE the nuts (30, 80) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. (6) Remove the protective caps from the electrical connectors.
END PRE SB 73-121
POST SB 73-121
(7) Install the bolt (10) and bolt (40) in the aft end of BSV.
(8) Install the nut (30) to the bolt (10).
(9) Install the nut (80) to the bolt (40).
(10) Install the bolt (10) and bolt (40) in the fuel support bracket.
(11) TORQUE the nuts (30, 80) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. (12) TORQUE bolts (10, 40) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. (13) Remove the protective caps from the electrical connectors.
END POST SB 73-121
D. Connect the electrical connectors, Channel A (50) and Channel B (60), to the BSV (70). Tighten the connectors by hand plus one eight of a turn.
Subtask 73-11-70-410-051-A ** ON A/C NOT FOR ALL NOTE: If necessary, use PLIERS - JAWED, SOFT.
E. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 73-11-70-440-050-A ** ON A/C NOT FOR ALL Subtask 73-11-70-710-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
G. Do the test:
(1) Do a FADEC ground test (Ref. AMM TASK 73-29-00-710-040).
Subtask 73-11-70-710-050-B ** ON A/C NOT FOR ALL (1) Do a FADEC ground test (Ref. AMM TASK 73-29-00-710-040).
NOTE: As an alternative procedure, you can do this operational test without the CFDS (Ref. AMM TASK 73-29-00-710-040).
(2) Do a minimum idle check (Ref. AMM TASK 71-00-00-710-006). G. Do a minimum idle check (Ref. AMM TASK 71-00-00-710-006) and make sure that on the CFDS no fault is shown related to the BSV.
5. Close-upSubtask 73-11-70-410-050-A ** ON A/C NOT FOR ALL
Burner Selection Valve (BSV) PRE SB 73-121