Removal of the Load Control Valve (131-9(A))
TASK 49-51-51-000-004-A
Removal of the Load Control Valve (131-9(A))
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 49-51-51-860-053-A ** ON A/C NOT FOR ALL
Subtask 49-51-51-020-054-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:31:13 UTC
Removal of the Load Control Valve (131-9(A))
WARNING:
DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | COVER - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| 98L12003001000 | AR | HARNESS,SAFETY |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 315AL, 316AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 52-41-00-010-001-A | Open the APU Doors for Access |
Subtask 49-51-51-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(2) On the overhead panel 25VU, make sure that the APU MASTER SW pushbutton switch is released (ON legend is off).
(3) On the APU section of overhead panel 25VU, put a WARNING NOTICE(S) to tell persons not to start the APU.
(4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
Subtask 49-51-51-865-059-A ** ON A/C NOT FOR ALL (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(2) On the overhead panel 25VU, make sure that the APU MASTER SW pushbutton switch is released (ON legend is off).
(3) On the APU section of overhead panel 25VU, put a WARNING NOTICE(S) to tell persons not to start the APU.
(4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 49-51-51-010-055-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
C. Get Access
(2) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the APU access doors 315AL and 316AR.
(3) Open APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-010-001).
(4) Set the light switch 11LJ to the ON position.
4. ProcedureWARNING:
BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
(1) Put on and attach the HARNESS, SAFETY before you start work in the work area.(2) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the APU access doors 315AL and 316AR.
(3) Open APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-010-001).
(4) Set the light switch 11LJ to the ON position.
Subtask 49-51-51-020-054-A ** ON A/C NOT FOR ALL
A. Removal of the Load Control Valve
(1) Disconnect the electrical connector (3).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Loosen the clamp (2) from the duct (1) and the valve (4).
(4) Hold the valve (4) and remove the clamp (6).
(5) Remove the valve (4).
(6) Remove and discard the seal (5).
(7) Install COVER - BLANKING on the ducts.
(1) Disconnect the electrical connector (3).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Loosen the clamp (2) from the duct (1) and the valve (4).
(4) Hold the valve (4) and remove the clamp (6).
(5) Remove the valve (4).
(6) Remove and discard the seal (5).
(7) Install COVER - BLANKING on the ducts.
Load Control Valve