W DOC AIRBUS | AMM A320F

Removal of the Load Control Valve (131-9(A))


TASK 49-51-51-000-004-A
Removal of the Load Control Valve (131-9(A))


WARNING: DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
No specific
AR
CAP - BLANKING
No specific
AR
COVER - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
98L12003001000
AR
HARNESS,SAFETY
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
315AL, 316AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 52-41-00-010-001-A
Open the APU Doors for Access
3. Job Set-up
Subtask 49-51-51-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
   (2) On the overhead panel 25VU, make sure that the APU MASTER SW pushbutton switch is released (ON legend is off).
   (3) On the APU section of overhead panel 25VU, put a WARNING NOTICE(S) to tell persons not to start the APU.
   (4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
Subtask 49-51-51-865-059-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR BLEED/X FEED/VALVE/BAT2HVD13
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
Subtask 49-51-51-010-055-A ** ON A/C NOT FOR ALL
C. Get Access
WARNING: BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
   (1) Put on and attach the HARNESS, SAFETY before you start work in the work area.
   (2) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the APU access doors 315AL and 316AR.
   (3) Open APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-010-001).
   (4) Set the light switch 11LJ to the ON position.
4. Procedure
Subtask 49-51-51-020-054-A ** ON A/C NOT FOR ALL
A. Removal of the Load Control Valve
   (1) Disconnect the electrical connector (3).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Loosen the clamp (2) from the duct (1) and the valve (4).
   (4) Hold the valve (4) and remove the clamp (6).
   (5) Remove the valve (4).
   (6) Remove and discard the seal (5).
   (7) Install COVER - BLANKING on the ducts.
[Rev.10 from 2021] 2026.04.01 01:31:13 UTC