W DOC AIRBUS | AMM A320F

Removal of the Total Pressure Tube (131-9(A))


TASK 49-51-17-000-004-A
Removal of the Total Pressure Tube (131-9(A))


WARNING: DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
315AL, 316AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 52-41-00-010-001-A
Open the APU Doors for Access
3. Job Set-up
Subtask 49-51-17-860-056-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
   (2) On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.
   (3) Put a warning notice in the cockpit to tell persons not to start the APU.
   (4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
Subtask 49-51-17-865-056-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
Subtask 49-51-17-010-055-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the APU access doors 315AL and 316AR.
   (2) Open the APU access doors 315AL 316AR (Ref. AMM TASK 52-41-00-010-001).
   (3) Set the LIGHT control SW 11LJ to the ON position.
4. Procedure
Subtask 49-51-17-020-053-A ** ON A/C NOT FOR ALL
A. Removal of the Total Pressure Tube
   (1) Remove the bolt (4) and disconnect the tube retainer (3) from the differential pressure transducer (1).
   (2) Remove the bolt (8) and disconnect the tube retainer (6) from the probe total pressure (9).
   (3) Remove the tube (5) from the APU.
   (4) Remove and discard the packings (2) and (7) from both sides of the tube (5).
   (5) Put the PLUG-BLANKING in each disconnected line end.
[Rev.10 from 2021] 2026.04.01 01:30:59 UTC