1. Reason for the Job
MMEL 49-10-02B
APU AIR INTAKE FLAP
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 49-16-00-865-060-A ** ON A/C NOT FOR ALL
Subtask 49-16-00-440-050-A ** ON A/C NOT FOR ALL
Subtask 49-16-00-860-067-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:27:34 UTC
Reactivation of the Air Intake Flap (APS 3200)
1. Reason for the Job
MMEL 49-10-02B
APU AIR INTAKE FLAP
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | 1 | FLASHLIGHT |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 313 | TAIL CONE APU AIR INTAKE AREA |
| 314 | TAIL CONE APU AIR INTAKE AREA |
| 314AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 49-16-00-210-002-A | Detailed Inspection of APU Air Intake, Diffuser Elbow, Seals and Felt Metal (APS 3200) |
| TASK 49-16-43-000-005-A | Removal of the Catwalk Panel (APS3200) |
| TASK 49-16-43-400-005-A | Installation of the Catwalk Panel (APS3200) |
| TASK 52-41-23-010-801-A | Opening of Access Door 314AR |
| TASK 52-41-23-410-801-A | Closing of Access Door 314AR |
Subtask 49-16-00-865-060-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 49-16-00-860-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
B. Get Access
(2) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below access door 314AR.
(3) Open access door 314AR and safety it in the open position.
(Ref. AMM TASK 52-41-23-010-801).
(4) If necessary, use a FLASHLIGHT.
(5) Remove the catwalk panel (Ref. AMM TASK 49-16-43-000-005).
4. ProcedureWARNING:
BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
(1) Put on and attach a safety harness before you start work in the work area(2) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below access door 314AR.
(3) Open access door 314AR and safety it in the open position.
(Ref. AMM TASK 52-41-23-010-801).
(4) If necessary, use a FLASHLIGHT.
(5) Remove the catwalk panel (Ref. AMM TASK 49-16-43-000-005).
Subtask 49-16-00-440-050-A ** ON A/C NOT FOR ALL
A. Connection of the Electrical Connectors
(1) Disconnect the temporary connector from the electrical connector 7527VC-A.
(2) Remove and discard the TIE WRAP which holds the electrical connector 7527VC-A to the service frame.
(3) Remove the CAP - BLANKING from the electrical connector 7527VC.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector 7527VC-A to the connector 7527VC.
Subtask 49-16-00-865-061-A ** ON A/C NOT FOR ALL (1) Disconnect the temporary connector from the electrical connector 7527VC-A.
(2) Remove and discard the TIE WRAP which holds the electrical connector 7527VC-A to the service frame.
(3) Remove the CAP - BLANKING from the electrical connector 7527VC.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector 7527VC-A to the connector 7527VC.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 49-16-00-440-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
C. Reactivation of the Air Intake Flap
(1) Do the trouble shooting procedure for the air intake flap-actuator 4015KM (Ref.TSM 49).
(2) Do the inspection of the air intake system (Ref. AMM TASK 49-16-00-210-002).
(3) Make an entry in the logbook to show that the air intake flap is reactivated.
5. Close-up(1) Do the trouble shooting procedure for the air intake flap-actuator 4015KM (Ref.TSM 49).
(2) Do the inspection of the air intake system (Ref. AMM TASK 49-16-00-210-002).
(3) Make an entry in the logbook to show that the air intake flap is reactivated.
Subtask 49-16-00-860-067-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Install the catwalk panel (Ref. AMM TASK 49-16-43-400-005).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close access door 314AR (Ref. AMM TASK 52-41-23-410-801).
(4) Remove the access platform(s).
(1) Install the catwalk panel (Ref. AMM TASK 49-16-43-400-005).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close access door 314AR (Ref. AMM TASK 52-41-23-410-801).
(4) Remove the access platform(s).