Replacement of the Fuse of the Lighting Controller
TASK 33-13-51-960-801-A
Replacement of the Fuse of the Lighting Controller
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 33-13-51-861-050-A
Subtask 33-13-51-960-050-A
Subtask 33-13-51-860-051-A
[Rev.10 from 2021]
2026.04.01 00:52:57 UTC
Replacement of the Fuse of the Lighting Controller
NOTE: The replacement procedures for the fuses of a lighting controller are the same. Thus, for each lighting controller, only one procedure is given.
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | FUSE | AIPC 33-13-51-01-010 |
| 10 | FUSE | AIPC 33-13-51-02-010 |
| 7 | FUSE | AIPC 33-13-51-02-010 |
| 11 | FUSE | AIPC 33-13-51-02-020 |
| 6 | FUSE | AIPC 33-13-51-02-030 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 33-13-00-710-001-A | Operational Test of the Instrument and Panel Integral-Lighting |
Subtask 33-13-51-861-050-A
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 33-13-51-865-053-A (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
B. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 6LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/OVHD/PNL | 3LF | Y03 |
| FOR FIN: 16LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/MAIN INST/PNL AND/PED | 4LF | Y04 |
| FOR FIN: 30LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/GLARE/SHLD | 5LF | Y05 |
Subtask 33-13-51-960-050-A
A. Replacement of the Fuse of the Lighting Controller (6LF)
(2) Remove and discard the fuse (2).
(3) Install a new AIPC 33-13-51-01-010 FUSE (2) on the lighting controller (1).
Subtask 33-13-51-960-051-A CAUTION:
WHEN YOU INSTALL A FUSE, MAKE SURE THAT THE RATING OF THE NEW FUSE IS CORRECT. IF YOU DO NOT OBEY THIS PRECAUTION, YOU CAN CAUSE IMPORTANT DAMAGE TO THE EQUIPMENT.
(1) Remove the cap (3). (2) Remove and discard the fuse (2).
(3) Install a new AIPC 33-13-51-01-010 FUSE (2) on the lighting controller (1).
NOTE: The rating of the fuse (2) is 6.3 A.
(4) Install the cap (3) on the lighting controller (1) and tighten it. B. Replacement of the Fuse of the Lighting Controller (16LF)
(2) Remove and discard the fuse (2).
(3) Install a new AIPC 33-13-51-01-010 FUSE (2) on the lighting controller (4).
Subtask 33-13-51-960-052-A ** ON A/C NOT FOR ALL CAUTION:
WHEN YOU INSTALL A FUSE, MAKE SURE THAT THE RATING OF THE NEW FUSE IS CORRECT. IF YOU DO NOT OBEY THIS PRECAUTION, YOU CAN CAUSE IMPORTANT DAMAGE TO THE EQUIPMENT.
(1) Remove the cap (3). (2) Remove and discard the fuse (2).
(3) Install a new AIPC 33-13-51-01-010 FUSE (2) on the lighting controller (4).
NOTE: The rating of the fuse (2) is 6.3 A.
(4) Install the cap (3) on the lighting controller (4) and tighten it. C. Replacement of the Fuse of the Lighting Controller (30LF)
(2) Remove and discard the fuse (7).
(3) Install a new AIPC 33-13-51-02-010 FUSE (7) on the lighting controller (5).
Subtask 33-13-51-960-052-B ** ON A/C NOT FOR ALL CAUTION:
WHEN YOU INSTALL A FUSE, MAKE SURE THAT THE RATING OF THE NEW FUSE IS CORRECT. IF YOU DO NOT OBEY THIS PRECAUTION, YOU CAN CAUSE IMPORTANT DAMAGE TO THE EQUIPMENT.
(1) Remove the cap (6). (2) Remove and discard the fuse (7).
(3) Install a new AIPC 33-13-51-02-010 FUSE (7) on the lighting controller (5).
NOTE: The rating of the fuse is 6.3 A.
(4) Install the cap (6) on the lighting controller (5) and tighten it. C. Replacement of the Fuse of the Lighting Controller (30LF)
(2) Remove and discard the fuse (6), (10) or (11).
(3) Install a new AIPC 33-13-51-02-030 FUSE (6) or a new AIPC 33-13-51-02-020 FUSE (11) or a new AIPC 33-13-51-02-010 FUSE (10) on the lighting controller (5).
Subtask 33-13-51-865-054-A CAUTION:
WHEN YOU INSTALL A FUSE, MAKE SURE THAT THE RATING OF THE NEW FUSE IS CORRECT. IF YOU DO NOT OBEY THIS PRECAUTION, YOU CAN CAUSE IMPORTANT DAMAGE TO THE EQUIPMENT.
(1) Remove the cap (7), (8) or (9) from the lighting controller (5). (2) Remove and discard the fuse (6), (10) or (11).
(3) Install a new AIPC 33-13-51-02-030 FUSE (6) or a new AIPC 33-13-51-02-020 FUSE (11) or a new AIPC 33-13-51-02-010 FUSE (10) on the lighting controller (5).
NOTE: The ratings of the fuses are:
(4) Install the cap (7), (8) or (9) on the lighting controller (5) and tighten it. - 5 A for the fuse (6)
- 6.3 A for the fuse (11)
- 4 A for the fuse (10).
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 33-13-51-710-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 6LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/OVHD/PNL | 3LF | Y03 |
| FOR FIN: 16LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/MAIN INST/PNL AND/PED | 4LF | Y04 |
| FOR FIN: 30LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/GLARE/SHLD | 5LF | Y05 |
E. Do the operational test of the instrument and panel integral-lighting (Ref. AMM TASK 33-13-00-710-001).
5. Close-upSubtask 33-13-51-860-051-A
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove all the fixtures, tools, test and support equipment used during this procedure.
(3) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove all the fixtures, tools, test and support equipment used during this procedure.
(3) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Fuses of the Lighting Controllers