W DOC AIRBUS | AMM A320F

Replacement of the Fuse of the Lighting Controller


TASK 33-13-51-960-801-A
Replacement of the Fuse of the Lighting Controller


NOTE: The replacement procedures for the fuses of a lighting controller are the same. Thus, for each lighting controller, only one procedure is given.
ZONE: 210
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
2
FUSE
AIPC 33-13-51-01-010
10
FUSE
AIPC 33-13-51-02-010
7
FUSE
AIPC 33-13-51-02-010
11
FUSE
AIPC 33-13-51-02-020
6
FUSE
AIPC 33-13-51-02-030
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 33-13-00-710-001-A
Operational Test of the Instrument and Panel Integral-Lighting
F Fuses of the Lighting Controllers ** ON A/C NOT FOR ALL
F Fuses of the Lighting Controllers ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 33-13-51-861-050-A
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 33-13-51-865-053-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 6LF (CONTROLLERLIGHTING)
122VULIGHTING/INSTL LT/OVHD/PNL3LFY03
FOR FIN: 16LF (CONTROLLERLIGHTING)
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
FOR FIN: 30LF (CONTROLLERLIGHTING)
122VULIGHTING/INSTL LT/GLARE/SHLD5LFY05
4. Procedure
Subtask 33-13-51-960-050-A
A. Replacement of the Fuse of the Lighting Controller (6LF)
CAUTION: WHEN YOU INSTALL A FUSE, MAKE SURE THAT THE RATING OF THE NEW FUSE IS CORRECT. IF YOU DO NOT OBEY THIS PRECAUTION, YOU CAN CAUSE IMPORTANT DAMAGE TO THE EQUIPMENT.
   (1) Remove the cap (3).
   (2) Remove and discard the fuse (2).
   (3) Install a new AIPC 33-13-51-01-010 FUSE (2) on the lighting controller (1).
NOTE: The rating of the fuse (2) is 6.3 A.
   (4) Install the cap (3) on the lighting controller (1) and tighten it.
Subtask 33-13-51-960-051-A Subtask 33-13-51-960-052-A ** ON A/C NOT FOR ALL Subtask 33-13-51-960-052-B ** ON A/C NOT FOR ALL Subtask 33-13-51-865-054-A
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 6LF (CONTROLLERLIGHTING)
122VULIGHTING/INSTL LT/OVHD/PNL3LFY03
FOR FIN: 16LF (CONTROLLERLIGHTING)
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
FOR FIN: 30LF (CONTROLLERLIGHTING)
122VULIGHTING/INSTL LT/GLARE/SHLD5LFY05
Subtask 33-13-51-710-051-A
5. Close-up
Subtask 33-13-51-860-051-A
A. Put the aircraft back to its initial configuration.
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove all the fixtures, tools, test and support equipment used during this procedure.
   (3) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.01 00:52:57 UTC