W DOC AIRBUS | AMM A320F

Installation of the Integrally-Lighted Identification Plate


TASK 33-13-41-400-001-A
Installation of the Integrally-Lighted Identification Plate


ZONE: 210
ZONE: 211
ZONE: 212
FIN: 18LF
FIN: 19LF
FIN: 20LF
FIN: 21LF
FIN: 22LF
FIN: 23LF
FIN: 24LF
FIN: 25LF
FIN: 26LF
FIN: 35LF
FIN: 36LF
FIN: 51LF
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
211
COCKPIT
212
COCKPIT
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 27-41-41-400-001-A
Installation of the Control Mechanism-Pitch Trim
TASK 27-51-43-400-002-A
Installation of the Lighted Plate
TASK 33-13-00-710-001-A
Operational Test of the Instrument and Panel Integral-Lighting
TASK 76-11-41-400-040-A
Installation of the Throttle Control Lever Assembly
TASK 76-11-41-400-041-A
Installation of the Throttle Control Lever Assembly
TASK 76-11-41-400-042-A
Installation of the Throttle Control Lever Assembly
TASK 76-11-41-400-802-A
Installation of the Throttle Control Lever Assembly
ESPM 2045210
AIPC 76-12-08-
3. Job Set-up
Subtask 33-13-41-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
4. Procedure
Subtask 33-13-41-420-054-B ** ON A/C NOT FOR ALL
A. Installation of the Integrally-Lighted Identification Plate (21LF)
   (1) Install the integrally-lighted identification plate of the throttle control-lever assembly (Ref. AMM TASK 76-11-41-400-040).
Subtask 33-13-41-420-054-C ** ON A/C NOT FOR ALL
A. Installation of the Integrally-Lighted Identification Plate (21LF)
   (1) Install the integrally-lighted identification plate of the throttle control-lever assembly (Ref. AMM TASK 76-11-41-400-041).
Subtask 33-13-41-420-054-D ** ON A/C NOT FOR ALL
A. Installation of the Integrally-Lighted Identification Plate (21LF)
   (1) Install the integrally-lighted identification plate of the throttle control-lever assembly (Ref. AMM TASK 76-11-41-400-042).
Subtask 33-13-41-420-054-F ** ON A/C NOT FOR ALL
A. Installation of the Integrally-Lighted Identification Plate (21LF)
   (1) Install the integrally-lighted identification plate of the throttle control-lever assembly (Ref. AMM TASK 76-11-41-400-802).
Subtask 33-13-41-420-050-A
B. Installation of the Integrally-Lighted Identification Plate (19LF and 20LF)
   (1) Put the integrally-lighted identification plates (36) and (38).
   (2) Install the screws (35) and (37).
   (3) Install the indicators (34) and the wheels (33) (Ref. AMM TASK 27-41-41-400-001).
Subtask 33-13-41-420-055-A
C. Installation of the Integrally-Lighted Identification Plate (18LF)
   (1) Put the integrally-lighted identification plate (2) in position on SWITCHING panel 8VU (4).
   (2) Install the four screws (1).
   (3) Tighten the four screws (1).
   (4) Tighten the four quarter-turn fasteners (3).
Subtask 33-13-41-420-056-A
D. Installation of the Integrally-Lighted Identification Plates (23LF and 24LF)
   (1) Put the integrally-lighted identification plates (30) and (6) in position on FLOOD LT panel 112VU (32) and FLOOD LT/INTEG LT panel 111VU (8).
   (2) Install the two screws (29) and (5).
   (3) Tighten the two screws (29) and (5).
   (4) Tighten the two quarter-turn fasteners (31) and (7).
Subtask 33-13-41-420-057-A
E. Installation of the Integrally-Lighted Identification Plate (26LF)
   (1) Pull the disassembled ENG/MASTER 1 and 2 control switches (3KC and 2KC) through the integrally-lighted identification plate (26).
   (2) Put the integrally-lighted identification plate (26) in position on ENG panel 115VU (28).
   (3) Install the three screws (25).
   (4) Tighten the three screws (25).
   (5) Tighten the four quarter-turn fasteners (27).
   (6) Install the washers, the nuts and the knobs of the ENG/MASTER 1 and 2 control switches (3KC and 2KC) AIPC 76-12-08- ESPM 2045210.
Subtask 33-13-41-420-058-A
F. Installation of the Integrally-Lighted Identification Plate (22LF)
   (1) Put the integrally-lighted identification plate (10) in position on RUD TRIM/PARKING BRK panel 110VU (11).
   (2) Install the four screws (9).
   (3) Tighten the four screws (9).
   (4) Tighten the four quarter-turn fasteners (12).
Subtask 33-13-41-420-059-A
G. Installation of the Integrally-Lighted Identification Plates (35LF and 36LF)
   (1) Put the integrally-lighted identification plates (14) in position on the GEAR panel (16).
   (2) Install the four screws (13) and (15).
   (3) Tighten the four screws (13) and (15).
Subtask 33-13-41-420-060-A
H. Installation of the Integrally-Lighted Identification Plate (25LF)
   (1) Install the integrally-lighted identification plate (Ref. AMM TASK 27-51-43-400-002).
Subtask 33-13-41-420-061-A
I. Installation of the Integrally-Lighted Identification Plate (50LF), if Installed
   (1) Put the integrally-lighted identification plate (18) in position on VIP COM panel 113VU (20).
   (2) Install the three screws (17).
   (3) Tighten the three screws (17).
   (4) Tighten the two quarter-turn fasteners (19).
Subtask 33-13-41-420-062-A
J. Installation of the Integrally-Lighted Identification Plate (51LF), if Installed
   (1) Put the integrally-lighted identification plate (22) in position on COCKPIT DOOR panel 119VU (24).
   (2) Install the three screws (21).
   (3) Tighten the three screws (21).
   (4) Tighten the two quarter-turn fasteners (23).
Subtask 33-13-41-865-052-A
K. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
Subtask 33-13-41-710-050-A
L. Do the operational test (Ref. AMM TASK 33-13-00-710-001).
5. Close-up
Subtask 33-13-41-942-050-A
A. Make sure that the work area is clean and clear of tools and other items.
[Rev.10 from 2021] 2026.04.01 00:52:50 UTC