Installation of the Lighted Plate
TASK 27-51-43-400-002-A
Installation of the Lighted Plate
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 27-51-43-860-054-A
Subtask 27-51-43-420-052-A
Subtask 27-51-43-860-055-A
[Rev.10 from 2021]
2026.03.31 23:52:44 UTC
Installation of the Lighted Plate
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
ZONE: 210
1. Reason for the JobSelf Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | Torque wrench: range to between 0.022 and 0.018 m.daN (1.95 and 1.59 lbf.in ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04JMD3) | Top Coat Polyurethane-- Decorative External Structure |
| (Material No.05BAE1) | Threadlocking Adhesive-- Medium strength - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 16 | PIN | AIPC 27-51-43-01-040 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 27-50-00-866-009-A | Retraction of the Flaps on the Ground |
| TASK 27-50-00-866-009-A-01 | Retraction of the Flaps/Slats on the Ground |
Subtask 27-51-43-860-054-A
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps and slats are in the fully retracted position (Ref. AMM TASK 27-50-00-866-009).
(2) Make sure that the hydraulic systems are depressurized.
Subtask 27-51-43-865-054-A (1) Make sure that the flaps and slats are in the fully retracted position (Ref. AMM TASK 27-50-00-866-009).
(2) Make sure that the hydraulic systems are depressurized.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT FLP/POS/IND 1 | 1CN | B12 |
| 49VU | FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 | 6CV | B07 |
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT FLP/POS/IND 1 | 1CN | B07 |
| 49VU | FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 | 6CV | B02 |
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FLIGHT CONTROLS/SLT FLP/2POS/IND | 2CN | P16 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/WTB/FLP/SYS2 | 12CV | P20 |
| 121VU | FLIGHT CONTROLS/WTB/SLT/SYS2 | 11CV | P19 |
| 121VU | FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 | 8CV | Q21 |
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FLIGHT CONTROLS/SLT FLP/2POS/IND | 2CN | P21 |
| ** ON A/C ALL | |||
| 122VU | FLIGHT CONTROLS/WTB/FLP/SYS1 | 10CV | S07 |
| 122VU | FLIGHT CONTROLS/WTB/SLT/SYS1 | 9CV | S06 |
| 122VU | LIGHTING/INSTL LT/MAIN INST/PNL AND/PED | 4LF | Y04 |
Subtask 27-51-43-420-052-A
A. Installation of the Lighted Plate
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the lighted plate (20) on the control lever assembly (19).
(4) Install the screws (11) and tighten them.
(5) Install the index (15) on the lever (18).
(6) Install the new AIPC 27-51-43-01-040 PIN (16) through the levers (17) and (18).
(7) Installation of the set screw
(b) Make sure that the pin (16) is correctly safetied, (that it does not move laterally when you push it).
(c) TORQUE the set screw (14) to between 0.022 and 0.018 m.daN (1.95 and 1.59 lbf.in )
.
(d) Apply Top Coat Polyurethane-- Decorative External Structure (Material No.04JMD3) to the pin (16).
(8) Install the handle (12) on the lever (18).
(9) Install the screw (13) with Threadlocking Adhesive-- Medium strength - (Material No.05BAE1) and tighten.
Subtask 27-51-43-865-055-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the lighted plate (20) on the control lever assembly (19).
(4) Install the screws (11) and tighten them.
(5) Install the index (15) on the lever (18).
(6) Install the new AIPC 27-51-43-01-040 PIN (16) through the levers (17) and (18).
(7) Installation of the set screw
CAUTION:
DO NOT TIGHTEN THE SET SCREW TOO MUCH. THIS CAN CAUSE DAMAGE TO THE PIN.
(a) Install the set screw (14) with Threadlocking Adhesive-- Medium strength - (Material No.05BAE1) into the lever (17), until the set screw touches the pin (16). (b) Make sure that the pin (16) is correctly safetied, (that it does not move laterally when you push it).
(c) TORQUE the set screw (14) to between 0.022 and 0.018 m.daN (1.95 and 1.59 lbf.in )
. (d) Apply Top Coat Polyurethane-- Decorative External Structure (Material No.04JMD3) to the pin (16).
(8) Install the handle (12) on the lever (18).
(9) Install the screw (13) with Threadlocking Adhesive-- Medium strength - (Material No.05BAE1) and tighten.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT FLP/POS/IND 1 | 1CN | B12 |
| 49VU | FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 | 6CV | B07 |
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT FLP/POS/IND 1 | 1CN | B07 |
| 49VU | FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 | 6CV | B02 |
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FLIGHT CONTROLS/SLT FLP/2POS/IND | 2CN | P16 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/WTB/FLP/SYS2 | 12CV | P20 |
| 121VU | FLIGHT CONTROLS/WTB/SLT/SYS2 | 11CV | P19 |
| 121VU | FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 | 8CV | Q21 |
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FLIGHT CONTROLS/SLT FLP/2POS/IND | 2CN | P21 |
| ** ON A/C ALL | |||
| 122VU | FLIGHT CONTROLS/WTB/FLP/SYS1 | 10CV | S07 |
| 122VU | FLIGHT CONTROLS/WTB/SLT/SYS1 | 9CV | S06 |
| 122VU | LIGHTING/INSTL LT/MAIN INST/PNL AND/PED | 4LF | Y04 |
Subtask 27-51-43-860-055-A
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tools and other items.
(1) Make sure that the work area is clean and clear of tools and other items.
Lighted Plate of the Flaps and Slats Control Lever