Check of NLG Torque Links for Excessive Play
TASK 32-21-00-200-003-B
Check of NLG Torque Links for Excessive Play
Refer to the MPD TASK: 322127-01
FUNCTIONAL CHECK OF NLG TORQUE LINKS FOR EXCESSIVE PLAY
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 32-21-00-941-095-A ** ON A/C NOT FOR ALL
Subtask 32-21-00-280-052-A ** ON A/C NOT FOR ALL
Subtask 32-21-00-942-071-A ** ON A/C NOT FOR ALL
[Rev.8 from Aug 2017]
2026.04.01 00:41:54 UTC
Check of NLG Torque Links for Excessive Play
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Refer to the MPD TASK: 322127-01
FUNCTIONAL CHECK OF NLG TORQUE LINKS FOR EXCESSIVE PLAY
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-21-00-200-803-B | Detailed Inspection of the Torque-Link Center Hinge-Pin |
| TASK 32-21-00-200-804-A | Check of Plays at Upper and Lower Torque-Link Hinges |
| TASK 32-21-27-000-002-A | Removal of the Torque-Link Center Hinge |
| TASK 32-21-27-400-002-A | Installation of the Torque-Link Center Hinge |
Subtask 32-21-00-941-095-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) Make sure that the D23080000 PIN-GROUND LOCK,NLG or MZ23080000 PIN-LOCKING as an alternative is in position.
Subtask 32-21-00-860-102-A ** ON A/C NOT FOR ALL (1) Make sure that the D23080000 PIN-GROUND LOCK,NLG or MZ23080000 PIN-LOCKING as an alternative is in position.
B. Aircraft Maintenance Configuration
(1) Remove the center hinge pin (Ref. AMM TASK 32-21-27-000-002).
4. Procedure(1) Remove the center hinge pin (Ref. AMM TASK 32-21-27-000-002).
Subtask 32-21-00-280-052-A ** ON A/C NOT FOR ALL
A. Detailed Inspection of the Center Hinge Pin
(1) Do the detailed inspection of the torque-link center hinge-pin (Ref. AMM TASK 32-21-00-200-803).
Subtask 32-21-00-220-072-A ** ON A/C NOT FOR ALL (1) Do the detailed inspection of the torque-link center hinge-pin (Ref. AMM TASK 32-21-00-200-803).
B. Inspection/Check of the NLG Torque-Link Assembly
(1) Do a check of the plays at the upper and lower torque-link hinges (Ref. AMM TASK 32-21-00-200-804).
5. Close-up(1) Do a check of the plays at the upper and lower torque-link hinges (Ref. AMM TASK 32-21-00-200-804).
Subtask 32-21-00-942-071-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Install the center hinge pin (Ref. AMM TASK 32-21-27-400-002).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Install the center hinge pin (Ref. AMM TASK 32-21-27-400-002).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.