Installation of the Waste-Water De-icing Sensor
TASK 30-71-17-400-001-A
Installation of the Waste-Water De-icing Sensor
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 30-71-17-860-050-A ** ON A/C NOT FOR ALL
Subtask 30-71-17-420-050-A ** ON A/C NOT FOR ALL
Subtask 30-71-17-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 08:23:05 UTC
Installation of the Waste-Water De-icing Sensor
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 131 | FORWARD CARGO COMPARTMENT |
| 131HW, 825 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 30-71-00-710-002-A | Operational Test of the Waste-Water Ice-Protection Heater-Elements |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 30-71-17-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
Subtask 30-71-17-010-051-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
B. Get Access
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the FWD-cargo compartment-door 825.
(2) Make sure that the FWD-cargo compartment-door 825 is open (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that the CARGO COMPT LIGHT switch 6LU is at ON.
(4) In the FWD cargo compartment, make sure that the panel 131HW is removed.
Subtask 30-71-17-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the FWD-cargo compartment-door 825.
(2) Make sure that the FWD-cargo compartment-door 825 is open (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that the CARGO COMPT LIGHT switch 6LU is at ON.
(4) In the FWD cargo compartment, make sure that the panel 131HW is removed.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | POT/WASTE WIP-HEATER-LINE | 1DW | A02 |
| 2000VU | POT/WASTE WIP-HEATER-CTL | 2DW | A01 |
Subtask 30-71-17-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Sensor
(1) On the waste water pipe, install the clamp sensor assembly (6) and the clamp (2) with the screws (4) and (5).
(2) Tighten the screws (4) and (5).
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the two wires of the clamp sensor assembly (6) to the terminal strip.
(6) Install the sleeve (3) around the clamp sensor assembly.
(7) Make sure that the sleeve (3) is correctly installed around the sensor and the pipe.
(8) Install the velcro tape (1) to attach the sleeve (3) around the clamp sensor assembly (6).
(9) Install the new cable ties of the identification and warning labels.
Subtask 30-71-17-865-052-A ** ON A/C NOT FOR ALL (1) On the waste water pipe, install the clamp sensor assembly (6) and the clamp (2) with the screws (4) and (5).
(2) Tighten the screws (4) and (5).
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the two wires of the clamp sensor assembly (6) to the terminal strip.
(6) Install the sleeve (3) around the clamp sensor assembly.
(7) Make sure that the sleeve (3) is correctly installed around the sensor and the pipe.
(8) Install the velcro tape (1) to attach the sleeve (3) around the clamp sensor assembly (6).
(9) Install the new cable ties of the identification and warning labels.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 30-71-17-710-053-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | POT/WASTE WIP-HEATER-LINE | 1DW | A02 |
| 2000VU | POT/WASTE WIP-HEATER-CTL | 2DW | A01 |
Subtask 30-71-17-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the panel 131HW.
(3) Set the CARGO COMPT LIGHT switch 6LU to OFF.
(4) Close the FWD-cargo compartment-door 825 (Ref. AMM TASK 52-30-00-860-002).
(5) Remove the access platform(s).
Subtask 30-71-17-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the panel 131HW.
(3) Set the CARGO COMPT LIGHT switch 6LU to OFF.
(4) Close the FWD-cargo compartment-door 825 (Ref. AMM TASK 52-30-00-860-002).
(5) Remove the access platform(s).
Waste-Water De-icing Sensor