Removal of the System Pressure Switch


TASK 29-32-12-000-001-A
Removal of the System Pressure Switch


WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 1151GN
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
1
CAP - BLANKING
No specific
1
CONTAINER - HYDRAULIC FLUID RESISTANT
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
2
WARNING NOTICE(S)
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
3. Job Set-up
Subtask 29-32-12-010-050-A
A. Open one main door of the main gear (Ref. AMM TASK 32-12-00-010-001).
Subtask 29-32-12-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
Subtask 29-32-12-860-050-A
C. Aircraft Maintenance Configuration
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (3) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
   (4) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
  • in the cockpit on the hydraulic section 40VU of the overhead panel,
  • on the ground service panel of the Green hydraulic system.
   (5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the main door of the main gear.
   (6) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
   (7) Put the CONTAINER - HYDRAULIC FLUID RESISTANT in position below the system pressure switch to collect any hydraulic fluid.
4. Procedure
Subtask 29-32-12-020-050-A
A. Removal of the System Pressure Switch
   (1) Disconnect the electrical connector (1).
   (2) Put the CAP - BLANKING on the disconnected electrical connector (1).
   (3) Remove the nut (5), the washer (6), the screw (8), the bonding jumper (7) and the clamp (9) from the system pressure switch (2).
   (4) Cut and remove the lockwire.
   (5) Loosen the system pressure switch (2) and remove it together with the O-ring (3) from the manifold (4).
   (6) Discard the O-ring.
   (7) Install a PLUG - BLANKING in the open ports.