Removal of the Green Leakage-Measurement Solenoid-Valve
TASK 29-19-51-000-001-A
Removal of the Green Leakage-Measurement Solenoid-Valve
This task is applicable for Aircraft with the Green High-Pressure Manifold P/N D29070171 series.
This task is not applicable for Aircraft with the Green High-Pressure Manifold P/N 1559A9900 series.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 29-19-51-865-050-A
Subtask 29-19-51-020-053-A
[Rev.10 from 2021]
2026.04.01 00:25:38 UTC
Removal of the Green Leakage-Measurement Solenoid-Valve
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobThis task is applicable for Aircraft with the Green High-Pressure Manifold P/N D29070171 series.
This task is not applicable for Aircraft with the Green High-Pressure Manifold P/N 1559A9900 series.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT) |
| No specific | 2 | CAP - BLANKING |
| No specific | 1 | CONTAINER 1 L (1/4 USGAL) |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-23-21-911-001-A | Removal/Installation of the Bobbins from their Housings and Installation of O-rings, Square Seals, and Back-up Rings on the Bobbins |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
Subtask 29-19-51-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-19-51-010-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST | 1881GP | N35 |
B. Get Access
(1) Open one main door of the main gear (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 3M (10 FT) in position.
Subtask 29-19-51-860-050-A (1) Open one main door of the main gear (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 3M (10 FT) in position.
C. Aircraft Maintenance Configuration
(2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001).
(4) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
Subtask 29-19-51-941-050-A WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001).
(4) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
D. Safety Precautions
(1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
4. Procedure(1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Green hydraulic system.
Subtask 29-19-51-020-053-A
A. Removal of the Solenoid Valve 1150GP
(1) Disconnect the electrical connector (1).
(2) Put a CAP - BLANKING on the disconnected electrical connector (1) and on the receptacle.
(4) Hold the solenoid valve (6) and remove the three bolts (7) and the washers (8).
(5) Remove the solenoid valve (6).
(6) Remove the bobbins (10) and (11) (Ref. AMM TASK 20-23-21-911-001).
(7) Install a PLUG - BLANKING in the open ports of the manifold (13) and the solenoid valve (6).
(8) Remove and discard the square-section seals (16) and (21), the O-rings (18) and (19) and the back-up rings (17), (9), (20) and (12).
(1) Disconnect the electrical connector (1).
(2) Put a CAP - BLANKING on the disconnected electrical connector (1) and on the receptacle.
CAUTION:
MAKE SURE THAT THE ELECTRICAL WIRE(S) IS(ARE) DISCONNECTED BEFORE YOU DISCONNECT THE BONDING STRAP(S).
(3) Remove the nut (2), the washer (3), the bolt (4) and the bonding strap (5) from the solenoid valve (6). (4) Hold the solenoid valve (6) and remove the three bolts (7) and the washers (8).
(5) Remove the solenoid valve (6).
(6) Remove the bobbins (10) and (11) (Ref. AMM TASK 20-23-21-911-001).
(7) Install a PLUG - BLANKING in the open ports of the manifold (13) and the solenoid valve (6).
(8) Remove and discard the square-section seals (16) and (21), the O-rings (18) and (19) and the back-up rings (17), (9), (20) and (12).
Leakage Measurement Solenoid Valve