1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CONTAINER 3 L(3/4 USGAL)
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
195BB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
3. Job Set-up
Subtask 29-14-41-865-055-A
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
** ON A/C ALL
123VUB HYD/ELEC PUMP2701GJAB09
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 29-14-41-010-053-A
B. Open the access panel 195BB.
Subtask 29-14-41-860-056-A
C. Aircraft Maintenance Configuration
   (1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green, Blue and Yellow hydraulic systems:
  • in the cockpit on the hydraulic section 40VU of the overhead panel
  • on the ground service panel of the Green, Blue and Yellow hydraulic systems.
   (2) Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration
(Ref. AMM TASK 29-00-00-864-001).
   (3) Depressurize the reservoirs of the Green, Blue and Yellow hydraulic systems (Ref. AMM TASK 29-14-00-614-001).
   (4) Put a CONTAINER 3 L(3/4 USGAL) below the drain valve of the water separator.
   (5) Drain the fluid from the water separator into the container.
   (6) Remove the container.
4. Procedure
Subtask 29-14-41-020-052-A
A. Removal of the Reservoir Pressurization Unit
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
   (1) Disconnect the lines (7), (4) and (2).
   (2) Put a PLUG - BLANKING on the disconnected line ends.
   (3) Remove the nuts (6), the bolts (9) and the washers (8).
   (4) Remove the reservoir pressurization unit (1).