W DOC AIRBUS | AMM A320F

Removal of the Ground Connector of the Reservoir Pressurization System


TASK 29-14-14-000-001-A
Removal of the Ground Connector of the Reservoir Pressurization System


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
2
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
195BB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
3. Job Set-up
Subtask 29-14-14-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
** ON A/C ALL
123VUB HYD/ELEC PUMP2701GJAB09
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 29-14-14-941-050-A
B. Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green, Blue and Yellow hydraulic systems:
  • In the cockpit on the hydraulic section 40VU of the overhead panel,
  • On the ground service panel of the Green, Blue and Yellow hydraulic systems.
Subtask 29-14-14-860-051-A
C. Aircraft Maintenance Configuration
   (1) Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration
(Ref. AMM TASK 29-00-00-864-001),
   (2) Depressurize the reservoirs of the Green, Blue and Yellow hydraulic systems (Ref. AMM TASK 29-14-00-614-001).
Subtask 29-14-14-010-050-A
D. Open the access panel 195BB.
4. Procedure
Subtask 29-14-14-020-050-A
A. Removal of the Ground Connector
   (1) Remove and discard the lockwire from the ground connector (1).
   (2) Remove the ground connector (1) and discard the O-ring (2).
   (3) Install a PLUG - BLANKING in the open ports of the air pressurization manifold (3) and the ground connector (1).
[Rev.10 from 2021] 2026.04.01 00:24:23 UTC