W DOC AIRBUS | AMM A320F

Removal of the Blue Power Accumulator


TASK 29-12-42-000-001-A
Removal of the Blue Power Accumulator


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 2070GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CONTAINER - HYDRAULIC FLUID RESISTANT
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
2
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
195BB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
3. Job Set-up
Subtask 29-12-42-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
123VUB HYD/ELEC PUMP2701GJAB09
Subtask 29-12-42-010-050-A
B. Open the access door 195BB.
Subtask 29-12-42-860-051-A
C. Aircraft Maintenance Configuration
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Blue hydraulic system:
  • in the cockpit on the hydraulic section 40VU of the overhead panel
  • on the ground service panel of the Blue hydraulic system.
   (3) Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (4) Depressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-001).
   (5) Put a CONTAINER - HYDRAULIC FLUID RESISTANT below the accumulator to collect unwanted hydraulic fluid.
Subtask 29-12-42-614-050-A
D. Release the nitrogen pressure from the accummulator as follows:
   (1) Remove the endcap from the charging valve (2).
   (2) Turn the nut to OPEN position and release the nitrogen pressure.
4. Procedure
Subtask 29-12-42-020-050-A
A. Removal of the Accumulator
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
   (1) Loosen the union nut (12) and disconnect the hydraulic line from the union (10).
   (2) Remove the nut (11) from the union (10).
   (3) Hold the accumulator assembly, loosen the two clamp screws and remove the two clamps (5).
   (4) Remove the accumulator assembly (8) from the mounting.
   (5) Close the open ends of the accumulator assembly and the hydraulic line with blanking caps.
[Rev.10 from 2021] 2026.04.01 07:51:04 UTC