Removal of the Accumulator-Air Pressure Gage
TASK 29-12-21-000-001-A
Removal of the Accumulator-Air Pressure Gage
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-12-21-865-050-A
Subtask 29-12-21-614-051-A
[Rev.10 from 2021]
2026.04.01 07:51:06 UTC
Removal of the Accumulator-Air Pressure Gage
FIN: 2072GM
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 2 | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 195BB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
Subtask 29-12-21-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-12-21-860-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
| 121VU | HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST | 1881GP | N35 |
| 123VU | B HYD/ELEC PUMP | 2701GJ | AB09 |
B. Aircraft Maintenance Configuration
(1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Blue hydraulic system:
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-001).
Subtask 29-12-21-010-050-A 4. Procedure(1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Blue hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Blue hydraulic system.
(Ref. AMM TASK 29-00-00-864-001).
(3) Depressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-001).
Subtask 29-12-21-614-051-A
A. Depressurization of the Power Accumulator (2072GM)
(1) Remove the endcap from the charging valve (4).
(2) Turn the nut to the OPEN position and release the nitrogen pressure.
Subtask 29-12-21-020-050-A (1) Remove the endcap from the charging valve (4).
(2) Turn the nut to the OPEN position and release the nitrogen pressure.
B. Removal of the Pressure Gage
(1) Cut, remove and discard the lockwire from the pressure gage (1).
(2) Hold the pressure gage (1) and loosen the nut (2).
(3) Remove the pressure gage (1).
(4) Install a PLUG - BLANKING on the pressure gage (1) and the adapter (3).
(1) Cut, remove and discard the lockwire from the pressure gage (1).
(2) Hold the pressure gage (1) and loosen the nut (2).
(3) Remove the pressure gage (1).
(4) Install a PLUG - BLANKING on the pressure gage (1) and the adapter (3).
Pressure Gage