Removal of the Hoisting Sling
TASK 27-80-00-000-001-A
Removal of the Hoisting Sling
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 27-80-00-941-057-A
Subtask 27-80-00-080-050-B
Subtask 27-80-00-942-056-A
[Rev.10 from 2021]
2026.03.31 23:56:14 UTC
Removal of the Hoisting Sling
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | WARNING NOTICE(S) |
| 98D27803000000 | 1 | LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 11-00-00-400-022-A | Installation of the Hoisting-Point Cover Patches |
| TASK 27-80-00-866-004-A | Extending the Slats on the Ground |
Subtask 27-80-00-941-057-A
A. Safety Precautions
(1) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate the slat controls.
(2) Make sure that the SAFETY BARRIER(S) are in position.
Subtask 27-80-00-860-050-A (1) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate the slat controls.
(2) Make sure that the SAFETY BARRIER(S) are in position.
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are fully extended (Ref. AMM TASK 27-80-00-866-004).
(2) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is installed on the slat/flap control lever on panel 114VU.
4. Procedure(1) Make sure that the slats are fully extended (Ref. AMM TASK 27-80-00-866-004).
(2) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is installed on the slat/flap control lever on panel 114VU.
Subtask 27-80-00-080-050-B
A. Removal of the Hoisting Sling
(1) Remove the trailing edge block (7) from the trailing edge of the slat.
(2) Remove the pip-pins (4) and disconnect the 98D27804009001 SLATS - SLING from the slat.
(3) Remove the lifting lugs (5) from the slat and connect them to the hoisting sling with the pip-pins (4).
(4) Remove the hoisting sling from the hoist.
(5) Install the blanking caps in the slat. Make sure that the top of the blanking caps are not above the surface of the slat.
(6) Do the Installation of the Hoisting Sling Cover Patches (Ref. AMM TASK 11-00-00-400-022).
5. Close-up(1) Remove the trailing edge block (7) from the trailing edge of the slat.
(2) Remove the pip-pins (4) and disconnect the 98D27804009001 SLATS - SLING from the slat.
(3) Remove the lifting lugs (5) from the slat and connect them to the hoisting sling with the pip-pins (4).
(4) Remove the hoisting sling from the hoist.
(5) Install the blanking caps in the slat. Make sure that the top of the blanking caps are not above the surface of the slat.
(6) Do the Installation of the Hoisting Sling Cover Patches (Ref. AMM TASK 11-00-00-400-022).
Subtask 27-80-00-942-056-A
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the safety barriers.
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the safety barriers.
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Hoisting Sling