Visual inspection of the Insulation Blankets or the Insulation and the Junction Panel


TASK 25-80-00-210-001-A
Visual inspection of the Insulation Blankets or the Insulation and the Junction Panel


ZONE: 120
ZONE: 130
ZONE: 150
ZONE: 160
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
120
AVIONICS COMPARTMENT
130
FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX
150
AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT
160
BULK CARGO COMPARTMENT AFT BULKHEAD OF AFT CARGO COMPARTMENT TO AFT BULKHEAD OF BULK CARGO COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-41-00-010-002-A
Open the Avionics Compartment Doors for Access
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
3. Job Set-up
Subtask 25-80-00-010-051-A
A. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) in position, as applicable.
   (2) Open the forward cargo-compartment door and/or the aft cargo-compartment door and install the actuator safety lock(s) (Ref. AMM TASK 52-30-00-860-001).
   (3) Open the avionics compartment door (Ref. AMM TASK 52-41-00-010-002).
   (4) Remove the applicable equipment, lining(s) and sidewall panel(s).
4. Procedure
Subtask 25-80-00-210-051-B ** ON A/C NOT FOR ALL
A. Inspection of the Insulation Blankets
   (1) Make sure that the insulation blankets are clean, dry and not damaged.
   (2) Make sure that the VELCRO strips on the attachment fittings are installed correctly.
   (3) Make sure that the attachment studs are in the correct condition.
   (4) Make sure that the clearance between the attachment studs and the adjacent electrical harness is a minimum of 10.0 mm (0.3937 in.).
   (5) If the clearance is less than 10.0 mm (0.3937 in.), cut the studs to the correct length.
   (6) Make sure that the insulation blankets are in the correct condition.
Subtask 25-80-00-210-051-C ** ON A/C NOT FOR ALL
A. Inspection of the Insulation Blankets
   (1) Make sure that the insulation blankets are clean, dry and not damaged.
   (2) Make sure that the VELCRO strips on the attachment fittings are installed correctly.
   (3) Make sure that the attachment studs are in the correct condition.
   (4) Make sure that the clearance between the attachment studs and the adjacent electrical harness is a minimum of 10.0 mm (0.3937 in.).
   (5) Adjust the clearance between the studs and the adjacent electrical harness:
     (a) Do not do the subsequent step below the stringer 19 level.
     (b) If the clearance is less than 10.0 mm (0.3937 in.), cut the studs to the correct length.
   (6) Make sure that the insulation blankets are in the correct condition.
5. Close-up
Subtask 25-80-00-410-051-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the applicable equipment, lining(s) and sidewall panel(s).
   (3) Close the avionics compartment door (Ref. AMM TASK 52-41-00-410-002).
   (4) Remove the actuator safety lock(s) and close the forward cargo-compartment door and/or the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
   (5) Remove the access platform(s).