Removal of the Additional Center-Tank (ACT) Relay-Box
TASK 25-71-11-000-001-A
Removal of the Additional Center-Tank (ACT) Relay-Box
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-71-11-861-050-A ** ON A/C NOT FOR ALL Subtask 25-71-11-010-050-A ** ON A/C NOT FOR ALL
Subtask 25-71-11-020-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:41:54 UTC
Removal of the Additional Center-Tank (ACT) Relay-Box
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 122 | AVIONICS COMPARTMENT |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
Subtask 25-71-11-861-050-A ** ON A/C NOT FOR ALL Subtask 25-71-11-010-050-A ** ON A/C NOT FOR ALL
B. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
(2) Open the access door 822.
Subtask 25-71-11-865-050-A ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
(2) Open the access door 822.
C. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | ACT1/REFUEL & SPLY | 33QU | L29 |
| 121VU | ACT XFR VALVE MAN CTL | 30QH | N29 |
| 121VU | ACT1/CTL & SPLY | 9QH | P29 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ACT2/REFUEL & SPLY | 34QU | L28 |
| 121VU | ACT2/CTL & SPLY | 10QH | P28 |
Subtask 25-71-11-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the ACT Relay Box
(1) Remove the four screws (3) and the cover (2).
(2) Disconnect the electrical connectors (4) and (5) from the relay box (1).
(4) Remove the relay box (1) from the mounting assy (8).
(5) Remove and keep the four clip nuts (7).
(6) Remove the four screws (9) and the mounting assy (8).
(1) Remove the four screws (3) and the cover (2).
(2) Disconnect the electrical connectors (4) and (5) from the relay box (1).
NOTE: Identify the two connectors before disconnection.
(3) Remove the two screws (6) on each side of the relay box (1). (4) Remove the relay box (1) from the mounting assy (8).
(5) Remove and keep the four clip nuts (7).
(6) Remove the four screws (9) and the mounting assy (8).
Additional Center Tank (ACT) Relay Box