W DOC AIRBUS | AMM A320F

Installation of the Remote-Control Panel (RCP) (Emergency Locator Transmitter)


TASK 25-65-18-400-001-A
Installation of the Remote-Control Panel (RCP) (Emergency Locator Transmitter)


ZONE: 200
FIN: 111MX ** ON A/C NOT FOR ALL
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-65-00-740-001-A
Emergency Locator Transmitter (ELT) System - BITE Test
F RCP 111MX ** ON A/C NOT FOR ALL
F RCP 111MX ** ON A/C NOT FOR ALL
F RCP 111MX ** ON A/C NOT FOR ALL
F RCP 111MX ** ON A/C NOT FOR ALL
F RCP 111MX ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 25-65-18-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
Subtask 25-65-18-860-050-J ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-65-18-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the RCP 111MX
F RCP 111MX ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
     (a) Make sure that the switch guard (2) is closed.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Put the RCP (1) in position and connect the electrical connector (4).
   (6) Carefully install the RCP (1) and tighten the captive screws (3).
Subtask 25-65-18-420-050-C ** ON A/C NOT FOR ALL
A. Installation of the RCP 111MX
F RCP 111MX ** ON A/C NOT FOR ALL
F RCP 111MX ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Put the RCP (1) in position and connect the electrical connector (4).
   (6) Carefully install the RCP (1) and tighten the captive screws (3).
Subtask 25-65-18-420-050-D ** ON A/C NOT FOR ALL
A. Installation of the RCP 111MX
F RCP 111MX ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the ON-ARMED-TEST/RESET switch (5) is set to the ARMED position, and the switch guard (2) is closed.
   (4) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (5) Make sure that all the electrical connections are clean and in the correct condition.
   (6) Put the RCP (1) in position and connect the electrical connector (4).
     (a) Carefully install the RCP (1) and tighten the captive screws (3).
Subtask 25-65-18-420-050-J ** ON A/C NOT FOR ALL
A. Installation of the RCP 111MX
F RCP 111MX ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
     (a) Make sure that the switch guard (2) is closed.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Put the RCP (1) in position and connect the electrical connector (4).
   (6) Carefully install the RCP (1) and tighten the captive screws (3).
Subtask 25-65-18-740-050-A ** ON A/C NOT FOR ALL
B. Do the BITE test (Ref. AMM TASK 25-65-00-740-001).
Subtask 25-65-18-740-050-J ** ON A/C NOT FOR ALL
B. Do the BITE test (Ref. AMM TASK 25-65-00-740-001).
5. Close-up
Subtask 25-65-18-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 25-65-18-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Subtask 25-65-18-410-050-J ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 25-65-18-862-050-J ** ON A/C NOT FOR ALL
D. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).