Installation of the Roller Assembly
TASK 25-52-26-400-002-A
Installation of the Roller Assembly
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 25-52-26-860-050-A ** ON A/C NOT FOR ALL
Subtask 25-52-26-910-051-A ** ON A/C NOT FOR ALL
Subtask 25-52-26-410-051-A ** ON A/C NOT FOR ALL Subtask 25-52-26-865-067-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 06:23:10 UTC
Installation of the Roller Assembly
WARNING:
DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
- FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM THE MATERIAL MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03GBB1) | Synthetic Oil base Grease-General Purpose Clay Thickened - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 130 | FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX |
| 150 | AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-52-26-400-001-A | Installation of the Power Drive Unit |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 25-52-26-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the forward and/or aft cargo-compartment door is opened (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the opening of the applicable cargo-compartment door.
(4) Make sure that the warning notice is in position at the applicable control panel of the cargo loading system.
(5) Make sure that the light switch of the forward and/or aft cargo-compartment is in the "ON" position.
Subtask 25-52-26-865-066-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the forward and/or aft cargo-compartment door is opened (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the opening of the applicable cargo-compartment door.
(4) Make sure that the warning notice is in position at the applicable control panel of the cargo loading system.
(5) Make sure that the light switch of the forward and/or aft cargo-compartment is in the "ON" position.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | SEMI AUTO CLS-FWD | 3MY | E08 |
| 2000VU | SEMI AUTO CLS-FWD | 2MY | E06 |
| 2001VU | SEMI AUTO CLS-AFT | 103MY | D08 |
| 2001VU | SEMI AUTO CLS-AFT | 102MY | D06 |
Subtask 25-52-26-910-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Apply Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) to the roller shaft (6).
Subtask 25-52-26-420-051-B ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Apply Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) to the roller shaft (6).
B. Installation of the Roller Assembly:
(1) Put the roller assembly (1) in its correct installation position in the power drive unit (7).
(2) Install the roller shaft (6) in the power drive unit (7) and the roller assembly (1).
(3) Install the retained shims (5) on the roller shaft (6).
(4) Install the stop disc (4).
(5) Safety the roller shaft (6) with the retaining ring (3).
5. Close-up(1) Put the roller assembly (1) in its correct installation position in the power drive unit (7).
(2) Install the roller shaft (6) in the power drive unit (7) and the roller assembly (1).
(3) Install the retained shims (5) on the roller shaft (6).
(4) Install the stop disc (4).
(5) Safety the roller shaft (6) with the retaining ring (3).
Subtask 25-52-26-410-051-A ** ON A/C NOT FOR ALL Subtask 25-52-26-865-067-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 25-52-26-410-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | SEMI AUTO CLS-FWD | 3MY | E08 |
| 2000VU | SEMI AUTO CLS-FWD | 2MY | E06 |
| 2001VU | SEMI AUTO CLS-AFT | 103MY | D08 |
| 2001VU | SEMI AUTO CLS-AFT | 102MY | D06 |
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Close the forward and/or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) Set the light switch to off.
(5) Remove the access platform(s).
(6) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Close the forward and/or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) Set the light switch to off.
(5) Remove the access platform(s).
(6) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Roller Assy