W DOC AIRBUS | AMM A320F

Installation of the Waste Box of the Space Flex Lavatory


TASK 25-45-17-400-802-A
Installation of the Waste Box of the Space Flex Lavatory


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
GLOVES - RUBBER
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-45-18-400-802-A
Installation of the Access Doors of the Space Flex Lavatory
3. Job Set-up
Subtask 25-45-17-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-45-17-210-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Do a visual inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 25-45-17-420-052-A ** ON A/C NOT FOR ALL
B. Installation of the Waste Box of the Space Flex Lavatory
   (1) Put on the GLOVES - RUBBER.
   (2) Put the waste boxes (2) in position.
   (3) Make sure that the waste boxes (2) attach correctly with the VELCRO tapes.
   (4) If you removed the access door (1), install it (Ref. AMM TASK 25-45-18-400-802).
   (5) Close the access door (1).
5. Close-up
Subtask 25-45-17-862-051-A ** ON A/C NOT FOR ALL
A. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.01 06:21:20 UTC