W DOC AIRBUS | AMM A320F

Removal of the Waste Box


TASK 25-45-17-000-001-A
Removal of the Waste Box


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 25-45-18-000-002-A
Removal of the Access Door in the Lavatory
TASK 26-25-41-000-001-A
Removal of the Fire Extinguisher Bottle
3. Job Set-up
Subtask 25-45-17-861-050-A
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-45-17-020-050-A
A. Removal of the Waste Box
   (1) If necessary, open the access door (2) on the lavatory front wall.
   (2) Open the access door (1) inside the lavatory and if necessary remove it (Ref. AMM TASK 25-45-18-000-002).
   (3) Remove the waste container (7).
   (4) Remove the fire extinguisher (11) (Ref. AMM TASK 26-25-41-000-001).
   (5) Remove the screws (4), the washers (5), the nuts (6) and the waste chute (3).
   (6) Remove the screws (8), the washers (9) and the waste container console (10).
[Rev.10 from 2021] 2026.03.31 23:36:00 UTC