W DOC AIRBUS | AMM A320F

Installation of the Waste Chute Flap of the Space Flex Lavatory


TASK 25-45-15-400-802-A
Installation of the Waste Chute Flap of the Space Flex Lavatory


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-45-17-000-802-A
Removal of the Waste Box of the Space Flex Lavatory
TASK 25-45-17-400-802-A
Installation of the Waste Box of the Space Flex Lavatory
3. Job Set-up
Subtask 25-45-15-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the waste box is removed (Ref. AMM TASK 25-45-17-000-802).
4. Procedure
Subtask 25-45-15-210-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Do a visual inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 25-45-15-420-052-A ** ON A/C NOT FOR ALL
B. Installation of the Waste Chute Flap of the Space Flex Lavatory
   (1) Put the waste chute flaps (1) in position, then install the washers (2) and the screws (3).
   (2) Tighten the screws (3).
   (3) Put the dampers (6) in position, then install the pins (5) and the retainer rings (4).
   (4) Push the waste chute flaps (1) and make sure that they operate correctly.
5. Close-up
Subtask 25-45-15-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the waste box (Ref. AMM TASK 25-45-17-400-802).
   (2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
   (3) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-45-15-862-051-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:35:55 UTC