W DOC AIRBUS | AMM A320F

Toilet Shroud - Installation of a Spacer


TASK 25-40-00-340-002-A
Toilet Shroud - Installation of a Spacer


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CLOTH-EMERY (GRADE 320 - 400)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05EJL9)
Epoxy Adhesive-Metal to metal - Legacy
(Material No.08BBD1)
Non Aqueous Cleaner-- Isopropyl Alcohol -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-45-22-000-001-A
Removal of the Toilet Shroud and the Seat
TASK 25-45-22-400-001-A
Installation of the Toilet Shroud and the Seat
3. Job Set-up
Subtask 25-40-00-861-064-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-40-00-010-060-A
A. Get Access
   (1) Remove the toilet shroud (Ref. AMM TASK 25-45-22-000-001).
Subtask 25-40-00-340-054-A
B. Installation of a Spacer on the Toilet Shroud
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
   (1) Use a CLOTH-EMERY (GRADE 320 - 400) to remove old bonding material from the toilet shroud (1) and the spacer (2).
   (2) Use the Non Aqueous Cleaner-- Isopropyl Alcohol - (Material No.08BBD1) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) to clean the surfaces on the toilet shroud (1) and the spacer (2) to be bonded.
   (3) Apply the Epoxy Adhesive-Metal to metal - Legacy (Material No.05EJL9) to the surfaces on the spacer (2) to be bonded.
   (4) Put the spacer (2) in position on the toilet shroud (1).
NOTE: The bond between the joints will take approximately 2 hours to dry.
   (5) Use the Non Aqueous Cleaner-- Isopropyl Alcohol - (Material No.08BBD1) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) to remove unwanted bonding material.
Subtask 25-40-00-410-063-A
C. Close Access
   (1) Install the toilet shroud (Ref. AMM TASK 25-45-22-400-001).
5. Close-up
Subtask 25-40-00-942-057-A
A. Close-up
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 25-40-00-862-065-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:35:00 UTC