W DOC AIRBUS | AMM A320F

Installation of the Door of the Overhead Stowage-Compartment


TASK 25-24-41-400-002-A
Installation of the Door of the Overhead Stowage-Compartment


1. Reason for the Job
More than one person is necessary for this procedure.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.26 and 0.22 m.daN (23.01 and 19.47 lbf.in ) T
No specific
Torque wrench: range to between 0.28 and 0.22 m.daN (24.78 and 19.47 lbf.in ) T
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-24-00-710-001-A
Adjustment of the Overhead Stowage Compartment Doors
F Overhead Stowage-Compartment Door ** ON A/C NOT FOR ALL
F OHSC Door ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 25-24-41-860-051-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-24-41-420-062-A ** ON A/C NOT FOR ALL
A. Installation of the Overhead Stowage-Compartment Door
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Hold the door (1) in position and align the holes in the door with the holes in the hinge (4).
   (5) Install the washers (3) and the screws (2).
   (6) Torque the screws (2) to between 0.26 and 0.22 m.daN (23.01 and 19.47 lbf.in ) T.
Subtask 25-24-41-420-062-B ** ON A/C NOT FOR ALL
A. Installation of the Overhead Stowage-Compartment Door
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Put the door (1) in position in the housing (5).
   (5) Push the spline (2) back in the housing (5).
   (6) Make sure that the spline (2) is fully engaged.
NOTE: The pin (3) needs to be correctly engaged to the hole (4).
Subtask 25-24-41-420-062-D ** ON A/C NOT FOR ALL
A. Installation of the Overhead Stowage-Compartment Door
F Overhead Stowage-Compartment Door ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Put the door (1) in position in the housings (5).
   (5) Push the splines (2) back in the housings (5).
   (6) Make sure that the splines (2) are fully engaged. The splines (2) are engaged when you hear a click.
NOTE: The click tells you that the splines (2) are correctly engaged.
   (7) Make sure that the pins (3) are correctly engaged to the holes (4).
   (8) Close the door (1).
Subtask 25-24-41-420-062-E ** ON A/C NOT FOR ALL
A. Installation of the Overhead Stowage-Compartment Door
F OHSC Door ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Hold the door (1) in position and align the holes in the door with the holes in the hinges (2).
   (5) Install the washers (3) and the screws (4).
   (6) TORQUE the screws (4) to between 0.28 and 0.22 m.daN (24.78 and 19.47 lbf.in ) T.
Subtask 25-24-41-820-050-A 5. Close-up
Subtask 25-24-41-862-051-A
A. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).