W DOC AIRBUS | AMM A320F

General Visual Inspection of G and P Routes Installed in the Tail Cone and APU Accessory Compartment (EWIS)


TASK 24-92-00-210-025-A
General Visual Inspection of G and P Routes Installed in the Tail Cone and APU Accessory Compartment (EWIS)


ZONE: 315
ZONE: 316
1. Reason for the Job
Refer to the MPD TASK: 200315-01
GENERAL VISUAL INSPECTION OF G AND P ROUTES INSTALLED IN THE TAIL CONE AND APU ACCESSORY COMPARTMENT (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
315
TAIL CONE APU AND ACCESSORY COMPARTMENT
316
TAIL CONE APU AND ACCESSORY COMPARTMENT
315AL, 316AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 52-41-00-010-001-A
Open the APU Doors for Access
TASK 52-41-00-410-001-A
Close the APU Doors after Access
ESPM 2052110
3. Job Set-up
Subtask 24-92-00-010-079-A
A. Get Access
   (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the fuselage tail cone.
   (2) Open the APU doors 315AL 316AR for access (Ref. AMM TASK 52-41-00-010-001).
Subtask 24-92-00-862-069-A
B. Make sure that the aircraft electrical circuits are de-energized
(Ref. AMM TASK 24-41-00-862-002).
4. Procedure
Subtask 24-92-00-210-075-A
A. General Visual Inspection of G and P Route Wiring Installed in the Tail Cone and APU Accessory Compartment
   (1) Do a visual inspection of the wiring to make sure that there is no signs of ageing, alteration, overheating, scaling and deformation ESPM 2052110:
     (a) On the AC/DC feeder route: 3G.
     (b) On the AC/DC power-distribution route: 3P.
   (2) Make sure that there is no oil or fuel contamination.
5. Close-up
Subtask 24-92-00-410-079-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the APU doors 315AL 316AR after access (Ref. AMM TASK 52-41-00-410-001).
   (3) Remove the access platform(s).