W DOC AIRBUS | AMM A320F

Removal of the Additional Attendant Panel


TASK 23-73-13-000-001-A
Removal of the Additional Attendant Panel


ZONE: 200
FIN: 126RH
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 23-73-00-00
CABIN INTERCOMMUNICATION DATA SYSTEM (CIDS) - DESCRIPTION AND OPERATION
TASK 23-73-00-00-01
CABIN INTERCOMMUNICATION DATA SYSTEM (CIDS) - DESCRIPTION AND OPERATION
3. Job Set-up
Subtask 23-73-13-861-050-A
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
For the location of this component, refer to paragraph Component Location
(Ref. AMM D/O 23-73-00-00).
Subtask 23-73-13-865-050-A
B. Open, safety and tag these circuit breakers in this sequence:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUCOM/CIDS/DEU B/BAT143RHN12
** ON A/C NOT FOR ALL
49VUCOM/CIDS/DEU B/ESS153RHG03
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM09
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM08
** ON A/C NOT FOR ALL
121VUCOM / CIDS / DEU B / NORM FWD193RHM09
2001VUCIDS-DEU B-NORM-AFT194RHC08
** ON A/C NOT FOR ALL
121VUCOM/CIDS/DEU B BAT/L719RHQ10
121VUCOM/CIDS/DEU B BAT/R720RHQ11
49VUCOM/CIDS/DEU B ESS/L419RHG04
49VUCOM/CIDS/DEU B ESS/R420RHG05
121VUCOM NAV/CIDS/DEU B NORM/L619RHM07
121VUCOM NAV/CIDS/DEU B NORM/R620RHM08
4. Procedure
Subtask 23-73-13-020-050-A
A. Removal of the Additional Attendant Panel (AAP)
   (1) Remove the cover (1) from the AAP (2).
   (2) Remove the screws (3) and the washers (4).
   (3) Pull and lower the AAP (2) and disconnect the electrical connector (5).
   (4) Remove the AAP (2).
   (5) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
[Rev.10 from 2021] 2026.04.01 04:42:26 UTC