GENERAL VISUAL INSPECTION OF NOSE GEAR AND NOSE GEAR DOORS (EWIS)
TASK 05-27-10-200-001-A
GENERAL VISUAL INSPECTION OF NOSE GEAR AND NOSE GEAR DOORS (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-711-01
GENERAL VISUAL INSPECTION OF NOSE GEAR AND NOSE GEAR DOORS (EWIS)
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 05-27-10-010-050-A 4. Procedure
Subtask 05-27-10-210-050-A
Subtask 05-27-10-410-050-A
[Rev.10 from 2021]
2026.03.31 22:50:38 UTC
GENERAL VISUAL INSPECTION OF NOSE GEAR AND NOSE GEAR DOORS (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-711-01
GENERAL VISUAL INSPECTION OF NOSE GEAR AND NOSE GEAR DOORS (EWIS)
NOTE: This task can contribute to fuel savings.
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 711 | NOSE GEAR |
| 712 | LEG DOOR |
| 713 | MAIN DOORS |
| 714 | MAIN DOORS |
| 715 | AFT DOORS |
| 716 | AFT DOORS |
| 713, 714 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-21-00-210-803-A | Inspection of the NLG Harnesses |
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
| TASK 32-22-00-410-001-A | Nose Gear Doors - Ground Doors Closing |
Subtask 05-27-10-010-050-A 4. Procedure
Subtask 05-27-10-210-050-A
A. Inspection
(1) Do a general visual inspection of the nose gear, the nose gear doors and the leg door attached to the nose gear. This inspection includes zones 711, 712, 713, 714, 715 and 716.
(2) Do a general visual inspection of the 1M and 2M electrical harnesses for permitted damage (Ref. AMM TASK 32-21-00-210-803).
(3) Make sure that there are no signs of corrosion, cracks or damage.
(4) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up(1) Do a general visual inspection of the nose gear, the nose gear doors and the leg door attached to the nose gear. This inspection includes zones 711, 712, 713, 714, 715 and 716.
(2) Do a general visual inspection of the 1M and 2M electrical harnesses for permitted damage (Ref. AMM TASK 32-21-00-210-803).
(3) Make sure that there are no signs of corrosion, cracks or damage.
(4) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
Subtask 05-27-10-410-050-A