GENERAL VISUAL INSPECTION OF AFT PYLON FAIRING (EWIS)
TASK 05-24-70-210-802-A
GENERAL VISUAL INSPECTION OF AFT PYLON FAIRING (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-473-01
GENERAL VISUAL INSPECTION OF AFT PYLON FAIRING (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-24-70-010-052-A ** ON A/C NOT FOR ALL
Subtask 05-24-70-210-052-A ** ON A/C NOT FOR ALL
Subtask 05-24-70-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 22:50:02 UTC
GENERAL VISUAL INSPECTION OF AFT PYLON FAIRING (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-473-01
GENERAL VISUAL INSPECTION OF AFT PYLON FAIRING (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 473 | LOWER FAIRING |
| 483 | LOWER FAIRING |
| 473AL, 473AR, 483AL, 483AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 54-56-00-000-802-A | Removal of the Aft Pylon Fairing (APF) |
| TASK 54-56-00-400-802-A | Installation of the Aft Pylon Fairing (APF) |
| TASK 54-57-22-000-810-A | Removal of the Rear Mount Fairing (RMF) Door |
| TASK 54-57-22-400-810-A | Installation of the Rear Mount Fairing (RMF) Door |
Subtask 05-24-70-010-052-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) in position at zone 470 (480).
(2) Remove the access panels (Ref. AMM TASK 54-57-22-000-810):
(3) Remove the aft pylon fairing (Ref. AMM TASK 54-56-00-000-802).
4. Procedure(1) Put an ACCESS PLATFORM 2M (6 FT) in position at zone 470 (480).
(2) Remove the access panels (Ref. AMM TASK 54-57-22-000-810):
(3) Remove the aft pylon fairing (Ref. AMM TASK 54-56-00-000-802).
Subtask 05-24-70-210-052-A ** ON A/C NOT FOR ALL
A. Do a general visual inspection of the aft pylon fairing.
Make sure that:
5. Close-upMake sure that:
- There is no damage (corrosion, leaks or cracks) on all the parts of the components and the structure that you can see
- All the installations (wiring) are correctly attached.
Subtask 05-24-70-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the aft pylon fairing (Ref. AMM TASK 54-56-00-400-802).
(3) Install the access panels (Ref. AMM TASK 54-57-22-400-810):
(4) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the aft pylon fairing (Ref. AMM TASK 54-56-00-400-802).
(3) Install the access panels (Ref. AMM TASK 54-57-22-400-810):
(4) Remove the access platform(s).
Location of the Access Panels of the Left Pylon (Left Side)