General Visual Inspection of Core Compartment (EWIS)
TASK 05-24-50-210-801-A
General Visual Inspection of Core Compartment (EWIS)
Refer to the MPD TASK: ZL-453-02
GENERAL VISUAL INSPECTION OF CORE COMPARTMENT (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-24-50-010-052-A ** ON A/C NOT FOR ALL
Subtask 05-24-50-210-054-A ** ON A/C NOT FOR ALL
Subtask 05-24-50-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 04:53:57 UTC
General Visual Inspection of Core Compartment (EWIS)
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
1. Reason for the JobRefer to the MPD TASK: ZL-453-02
GENERAL VISUAL INSPECTION OF CORE COMPARTMENT (EWIS)
NOTE: This task can contribute to fuel savings.
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 453 | HOT SECTION |
| 454 | HOT SECTION |
| 463 | HOT SECTION |
| 464 | HOT SECTION |
| 437AL, 438AR, 447AL, 448AR, 451AL, 452AR, 461AL, 462AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-802-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-802-A | Closing of the Fan Cowl Doors |
| TASK 78-36-00-010-802-A | Opening of the Thrust Reverser Cowl-Doors |
| TASK 78-36-00-410-802-A | Closing of the Thrust Reverser Cowl-Doors |
Subtask 05-24-50-010-052-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the applicable zones 453, 454, 463 and 464.
(2) Open fan cowl doors 437AL, 438AR, 447AL and 448AR (Ref. AMM TASK 71-13-00-010-802).
(3) Open thrust reverser cowl-doors 451AL, 452AR, 461AL and 462AR (Ref. AMM TASK 78-36-00-010-802).
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the applicable zones 453, 454, 463 and 464.
(2) Open fan cowl doors 437AL, 438AR, 447AL and 448AR (Ref. AMM TASK 71-13-00-010-802).
(3) Open thrust reverser cowl-doors 451AL, 452AR, 461AL and 462AR (Ref. AMM TASK 78-36-00-010-802).
Subtask 05-24-50-210-054-A ** ON A/C NOT FOR ALL
A. Inspection
(1) Do a general visual inspection of the core compartment (zones 453, 454, 463 and 464).
(2) Make sure that:
5. Close-up(1) Do a general visual inspection of the core compartment (zones 453, 454, 463 and 464).
(2) Make sure that:
- There is no damage (corrosion, leaks or cracks) on all the parts of the components and the structure that you can see
- All the installations (wiring, piping, ducting) are correctly attached.
Subtask 05-24-50-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close thrust reverser cowl-doors 451AL, 452AR, 461AL and 462AR (Ref. AMM TASK 78-36-00-410-802).
(3) Close fan cowl doors 437AL, 438AR, 447AL and 448AR (Ref. AMM TASK 71-13-00-410-802).
(4) Remove the access platform(s).
(5) Remove all the fixtures, tools, test and support equipment used during this procedure.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close thrust reverser cowl-doors 451AL, 452AR, 461AL and 462AR (Ref. AMM TASK 78-36-00-410-802).
(3) Close fan cowl doors 437AL, 438AR, 447AL and 448AR (Ref. AMM TASK 71-13-00-410-802).
(4) Remove the access platform(s).
(5) Remove all the fixtures, tools, test and support equipment used during this procedure.
Access Doors of the Left Nacelle (Left Side)