W DOC AIRBUS | AMM A320F

GENERAL VISUAL INSPECTION OF OFFWING ESCAPE SLIDE STOWAGE AREA (EWIS)


TASK 05-21-90-200-003-A
GENERAL VISUAL INSPECTION OF OFFWING ESCAPE SLIDE STOWAGE AREA (EWIS)


ZONE: 193
ZONE: 194
1. Reason for the Job
Refer to the MPD TASK: ZL-193-01
GENERAL VISUAL INSPECTION OF OFFWING ESCAPE SLIDE STOWAGE AREA (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
193
UPPER WING FAIRING SLIDE STOWAGE
194
UPPER WING FAIRING SLIDE STOWAGE
193AT, 194AT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 25-62-42-000-001-A
Removal of the Offwing Escape Slide
TASK 25-62-42-400-001-A
Installation of the Offwing Escape Slide
TASK 53-35-11-000-001-A
Removal of the Wing-to-Fuselage Fairings
TASK 53-35-11-400-001-A
Installation of the Wing-to-Fuselage Fairings
3. Job Set-up
Subtask 05-21-90-010-052-A ** ON A/C NOT FOR ALL
A. Get Access
WARNING: MAKE SURE THAT THE LOCK PIN IS CORRECTLY INSTALLED IN THE REGULATOR VALVE ASSEMBLY OF THE INFLATION RESERVOIR. THIS SAFETIES ALL COMPONENTS OF THE INFLATION SYSTEM IN OPERATION AND PREVENTS ACCIDENTAL:
  • DISCHARGE OF THE INFLATION RESERVOIR
  • DEPLOYMENT OF THE ESCAPE SLIDE
WHICH CAN CAUSE INJURY AND/OR DAMAGE.
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at the zones 193 and 194.
   (2) Remove the offwing escape-slide enclosure (Ref. AMM TASK 25-62-42-000-001).
Subtask 05-21-90-010-052-B ** ON A/C NOT FOR ALL
A. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at the zones 193 and 194.
   (2) Remove the access panels 193AT and 194AT (Ref. AMM TASK 53-35-11-000-001).
4. Procedure
Subtask 05-21-90-210-052-A ** ON A/C NOT FOR ALL
A. Inspection
   (1) Do a general visual inspection of the stowage for the slide stowage compartment in the upper wing fairing.
   (2) Make sure that there are no signs of corrosion, cracks or damage.
   (3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
Subtask 05-21-90-210-052-B ** ON A/C NOT FOR ALL
A. Inspection
   (1) Do a general visual inspection of the compartment behind the panels 193AT and 194AT.
   (2) Make sure that there are no signs of corrosion, cracks or damage.
   (3) Make sure that all the installations (wiring) are attached correctly.
5. Close-up
Subtask 05-21-90-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the offwing escape-slide enclosure (Ref. AMM TASK 25-62-42-400-001).
   (2) Remove the access platform(s).
Subtask 05-21-90-410-052-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the access panels 193AT and 194AT (Ref. AMM TASK 53-35-11-400-001).
   (2) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 22:49:02 UTC