General Visual Inspection of Air Conditioning Compartment and Fairings (EWIS)
TASK 05-21-90-200-001-A
General Visual Inspection of Air Conditioning Compartment and Fairings (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-191-01
GENERAL VISUAL INSPECTION OF AIR CONDITIONING COMPARTMENT AND FAIRINGS (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-21-90-010-050-A ** ON A/C NOT FOR ALL
Subtask 05-21-90-210-050-A
Subtask 05-21-90-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 22:49:01 UTC
General Visual Inspection of Air Conditioning Compartment and Fairings (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-191-01
GENERAL VISUAL INSPECTION OF AIR CONDITIONING COMPARTMENT AND FAIRINGS (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191 | AIR CONDITIONING COMPT AND FAIRINGS |
| 192 | AIR CONDITIONING COMPT AND FAIRINGS |
| 191BB, 191KB, 192KB | |
| 191AB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 53-25-11-000-001-A | Removal of the Forward Belly Fairing Panels (191AT, 192AT, 191AB, 192AB) |
| TASK 53-25-11-400-001-A | Installation of Forward Belly Fairing Panels (191AT, 191AB, 192AT, 192AB) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
Subtask 05-21-90-010-050-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the zones 191 and 192.
(2) Remove the access panels 191BB, 191KB and 192KB (Ref. AMM TASK 53-35-13-000-002).
Subtask 05-21-90-010-050-C ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) in position at the zones 191 and 192.
(2) Remove the access panels 191BB, 191KB and 192KB (Ref. AMM TASK 53-35-13-000-002).
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the zones 191 and 192.
(2) Remove the access panels:
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the zones 191 and 192.
(2) Remove the access panels:
Subtask 05-21-90-210-050-A
A. Inspection
Air Conditioning Compartment and Fairings ** ON A/C NOT FOR ALL
Air Conditioning Compartment and Fairings ** ON A/C NOT FOR ALL
(1) Do a general visual inspection of the air conditioning compartment and fairings (zones 191 and 192).
(2) Make sure that there are no signs of corrosion, leaks, cracks or damage on all the parts of the components and the structure that you can see.
(3) Make sure that all the installations (wiring, ducting and piping) are correctly attached.
5. Close-up
Air Conditioning Compartment and Fairings ** ON A/C NOT FOR ALL
Air Conditioning Compartment and Fairings ** ON A/C NOT FOR ALL (2) Make sure that there are no signs of corrosion, leaks, cracks or damage on all the parts of the components and the structure that you can see.
(3) Make sure that all the installations (wiring, ducting and piping) are correctly attached.
Subtask 05-21-90-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels 191BB, 191KB and 192KB (Ref. AMM TASK 53-35-13-400-002).
(3) Remove the access platform(s).
(4) Remove all the fixtures, tools, test and support equipment used during this procedure.
Subtask 05-21-90-410-050-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels 191BB, 191KB and 192KB (Ref. AMM TASK 53-35-13-400-002).
(3) Remove the access platform(s).
(4) Remove all the fixtures, tools, test and support equipment used during this procedure.
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels:
(3) Remove the access platform(s).
(4) Remove all the fixtures, tools, test and support equipment used during this procedure.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels:
(3) Remove the access platform(s).
(4) Remove all the fixtures, tools, test and support equipment used during this procedure.