W DOC AIRBUS | AMM A320F

20-23 LINES


    20-23-00 LINES

  • PB.001 LINES - DESCRIPTION AND OPERATION
  • 20-23-11 INSTALLATION AND REPAIR OF TUBING

  • PB.201 INSTALLATION AND REPAIR OF TUBING - MAINTENANCE PRACTICES
  • 20-23-14 LINE TYING

  • PB.201 LINE TYING - MAINTENANCE PRACTICES
  • 20-23-21 HYDRAULIC BOBBINS

  • PB.201 HYDRAULIC BOBBINS - MAINTENANCE PRACTICES
    • 20-23-21-911-001-A [10]
      Removal/Installation of the Bobbins from their Housings and Installation of O-rings, Square Seals, and Back-up Rings on the Bobbins
  • 20-23-22 MARKING OF TIGHTENED UNIONS

  • PB.201 MARKING OF TIGHTENED UNIONS - MAINTENANCE PRACTICES
    • 20-23-22-910-001-A [10]
      Marking of the Unions after Application of Standard or Specific Tightening Torque
  • 20-23-38 INSTALLATION AND REPAIR OF WATER AND ASSOCIATED AIR SUPPLY TUBING

  • PB.201 INSTALLATION AND REPAIR OF WATER AND ASSOCIATED AIR SUPPLY TUBING - MAINTENANCE PRACTICES
    • 20-23-38-000-001-A [10]
      Removal of the Tube of the Potable Water and the associated Air Supply System
    • 20-23-38-300-001-A [10]
      Repair of the Tubes Assembly of the Potable Water and the associated Air Supply System to be carried out in the Workshop
    • 20-23-38-300-002-A [10]
      Repair of the Tubes of the Potable Water and the associated Air Supply System to be carried out in the Aircraft
    • 20-23-38-300-048-A [10]
      Repair of the Tubes with H-Fittings to be carried out in the Aircraft
    • 20-23-38-300-049-A [10]
      Temporary Repair of the Tube Assemblies with MS21922 Sleeves to be carried out in the Workshop
    • 20-23-38-300-802-A [10]
      Temporary Repair of Water Tubes by Welding
    • 20-23-38-400-003-A [10]
      Installation of the Tube Assembly of the Potable Water and the associated Air Supply System