W DOC AIRBUS | AMM A320F

Removal of the Gearbox Breather Tube [PW11]


TASK 79-23-49-000-802-A
Removal of the Gearbox Breather Tube


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AND THE ADJACENT COMPONENTS AFTER ENGINE SHUTDOWN. THE ENGINE, THE ENGINE OIL AND THE ADJACENT COMPONENTS CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
ZONE: 400
1. Reason for the Job
Use this procedure to remove the gearbox breather tube.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
COVER - PROTECTION
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
400
POWER PLANT, NACELLES AND PYLONS
FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR, 451AL, 452AR
FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR, 461AL, 462AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-00-00-860-833-A
Procedure to Prevent Engine Motoring
TASK 71-13-00-010-802-A
Opening of the Fan Cowl Doors
TASK 78-30-00-040-805-A
Deactivation of the Thrust Reverser System for Ground Maintenance
TASK 78-36-00-010-802-A
Opening of the Thrust Reverser Cowl-Doors
TASK 79-23-49-400-802-A
Installation of the Gearbox Breather Tube
3. Job Set-up
Subtask 79-23-49-941-052-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) Do the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
Subtask 79-23-49-010-054-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR.
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR.
Subtask 79-23-49-040-052-A ** ON A/C NOT FOR ALL
C. Deactivation of the Thrust Reverser for Maintenance
WARNING: YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
   (1) Do the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-805).
Subtask 79-23-49-010-055-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Open the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL, 452AR.
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL, 462AR.
4. Procedure
CAUTION: WIPE CLEAN ALL PARTS AND TOOLS AS NECESSARY TO REMOVE UNWANTED DEBRIS AND PREVENT DAMAGE TO THE ENGINE.
Subtask 79-23-49-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Gearbox Breather Tube
   (1) Find the gearbox breather tube (LB60) (1) attached to the Main Gearbox (MGB) at the 6 o'clock position.
   (2) Remove the gearbox breather tube (LB60) (1) from the MGB as follows:
     (a) Remove the two bolts (4) and the three bolts (5).
     (b) Remove the clamp (3) and the two clamps (6).
CAUTION: USE A SECOND WRENCH TO HOLD THE MATING PARTS WHEN YOU LOOSEN OR TIGHTEN THE TUBE OR HOSE NUTS. IF YOU DO NOT OBEY THIS CAUTION, YOU CAN TWIST OR CAUSE DAMAGE TO THE TUBES OR HOSES.
     (c) Disconnect the tube (LB60) (1) from the lubrication drain tube (LD60).
     (d) Remove the metering plug (2) from the tube (LD60).
     (e) Remove the three bolts (9).
     (f) Remove the bracket (8).
     (g) Remove the tube (LB60) (1) from the MGB.
     (h) Remove the seal (7).
     (i) Do an inspection of the face seal (7) to find if it is possible to use it again (Ref. AMM TASK 79-23-49-400-802).
   (3) Installation of the protection covers
CAUTION: INSTALL PROTECTION COVERS ON ALL THE OPENINGS IMMEDIATELY TO PREVENT DAMAGE TO THE ENGINE.
     (a) Make sure that you install COVER - PROTECTION as necessary to prevent damage to the engine.
[Rev.10 from 2021] 2026.04.01 03:42:02 UTC